EN 3.pdf - 第38页
Model DECAN Series Company SAMSUNG TECHWIN Module 3.2 BOARD V ersion 01 Tit le VISION IF BOARD REPLACEMENT Page 3-2-25 Note 4. Release the fixing bolts for the V ision IF Board a nd separate the board and replace it with…

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.2 BOARD
Version
01
Title
VISION IF BOARD REPLACEMENT
Page
3-2-24
Note
[VISION IF BOARD REPLACEMENT]
Vision IF Board sends the signals of video recorded by the Fiducial, Fly, Fix Camera to the Vision Board.
1. Separate the front cover from the equipment.
2. Separate the cable connected to the board.
3. Release the fixing bolts for the PC Rack and separate the PC Rack.

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.2 BOARD
Version
01
Title
VISION IF BOARD REPLACEMENT
Page
3-2-25
Note
4. Release the fixing bolts for the Vision IF Board and separate the board and replace it with a new board.
5. Before assembling the Board, make a short circuit on JP1,JP2.
6. Operate the equipment after connecting the cable and see if the LED is lit.(normal operation)
LED On : LED1, LED2, LED3

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.2 BOARD
Version
01
Title
PC RACK's BOARD REPLACEMENT
Page
3-2-26
Note
[PC RACK's BOARD REPLACEMENT]
PC Rack's Board
SBC Board : Processes and controls all the signals related to the equipment.
IT Master Board : Processes and controls the IT Feeder and the IT data(Feeder type, pitch info, remaining
parts inventory).
NT A8 Board : Processes visions recorded by Vision devices.
Back Plane Board : Board where each board of the PC Rack is mounted.