EN 3.pdf - 第85页

Model DECAN Series Company SAMSUNG TECHWIN Module 3.5 CONVEYOR V ersion 01 Tit le MOTOR REPLACEMENT Page 3-5-22 Note 3. Separate the pulley by releasing the Set Screws. 4. Replace with a new motor . 5. Assemble the Motor…

100%1 / 355
Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.5 CONVEYOR
Version
01
Title
MOTOR REPLACEMENT
Page
3-5-21
Note
[MOTOR REPLACEMENT]
Motor locations and names
① Entry / Exit Zone Frame Width Adjustment Motor
② Entry / Exit Zone Rear Frame Width Adjustment Motor
③ Entry / Exit Zone Front Frame PCB Conveyance Motor
④ Entry / Exit Zone Rear Frame PCB Conveyance Motor
⑤ Work Zone Front Fix Frame PCB Conveyance Motor
⑥ Work Zone Front Move Frame PCB Conveyance Motor
⑦ Work Zone Power Delivery Motor
Entry / Exit Zone Frame Width Adjustment Motor replacement
1. Separate the cable connected to the motor.
2. Remove the fixing bolts for the motor to separate it.
Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.5 CONVEYOR
Version
01
Title
MOTOR REPLACEMENT
Page
3-5-22
Note
3. Separate the pulley by releasing the Set Screws.
4. Replace with a new motor.
5. Assemble the Motor and the Pulley as follows.
6. Assemble the Motor into the Conveyor.
7. Adjust the Belt Tension.
Tension: 22±2 Hz
Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.5 CONVEYOR
Version
01
Title
MOTOR REPLACEMENT
Page
3-5-23
Note
Entry / Exit Zone Rear Frame Width Adjustment Motor replacement.
1. Separate the cable connected to the motor.
2. Remove the fixing bolts for the motor to separate it.
3. Replace with a new motor.
4. Assemble the Motor and the Pulley as follows.
5. Assemble the Motor into the Conveyor.