LBO 27 Zoll - 第60页

2 Assembly instructions LBO 27" SIPLACE X4 LBO 27" 09/2007 Edition 60 : The cable and the hose have to be ru n in the outer conveyor edge as shown in the following pictures. : The length of the cable and the ho…

100%1 / 96
LBO 27" 2 Assembly instructions LBO 27" SIPLACE X4
09/2007 Edition
59
2
CAUTION!
Make sure that the cables and hoses are running under the alloy block. 2
2
2
2
2
2
Run cables
and hose
under the
alloy block!
Replace
cable tie
Wrong!!!!!!
2 Assembly instructions LBO 27" SIPLACE X4 LBO 27"
09/2007 Edition
60
: The cable and the hose have to be run in the outer conveyor edge as shown in the following
pictures.
: The length of the cable and the hose has to be chosen like shown on the pictures.
: Place a returnable cable clip in the middle of the duct to fix the cables in a later step.
2
2
2
2
2
2
2
2
2
2
2
2
2
Fix cable with cable clip and
cable tie like shown on the
picture to the metal surface
Returnable cable clip in
the middle of the duct
The length of the hose should
be chosen like shown.
(10 cm to the left edge)
LBO 27" 2 Assembly instructions LBO 27" SIPLACE X4
09/2007 Edition
61
: Run the cable and the hose further along the plastic cable ducts to the conversion board. See
picture below. The cable has to be connected to the conversion board. The hose has to be run
through the middle of the machine into PA1 to the pneumatic block.
2
2
Feed hose through the duct into PA1 to
connect it to the pneumatic block
If the cables are to long,
store them here