LBO 27 Zoll - 第64页
2 Assembly instructions LBO 27" SIPLACE X4 LBO 27" 09/2007 Edition 64 : Connect the two connection cables from P A1 and P A2 to the conversion bo ard. The cable from P A2 has to be connected to X35 and the cabl…

LBO 27" 2 Assembly instructions LBO 27" SIPLACE X4
09/2007 Edition
63
: Fix the short hose and the cable coming from PA2 like shown on the picture below with cable
clips and cable ties.
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Place cable clips here
and attach cable and
hose like shown

2 Assembly instructions LBO 27" SIPLACE X4 LBO 27"
09/2007 Edition
64
: Connect the two connection cables from PA1 and PA2 to the conversion board. The cable from
PA2 has to be connected to X35 and the cable from PA1 to X34. See following pictures for de-
tails.
2
: After connecting all hoses and cables like described, close all cable ducts and covers. Put the
lifting tables back in both processing areas and mount them with the belonging screws.
Cable from PA2 to X35
Cable from PA1 to X34

LBO 27" 2 Assembly instructions LBO 27" SIPLACE X4
09/2007 Edition
65
2.6.2 Installation of the stopper in PA1 and PA2
The two stoppers are delivered pre-assembled and ready wired. The stoppers have to be moun-
ted to their positions and have to be connected to the before run cables and hoses. 2
2.6.2.1 Stopper PA1
The stopper for PA1 has to be mounted to the alloy block of the guide shaft on the right conveyor
side wall in PA1. 2
2
2
2
2
2
2
2
2
2
2
2
2
2
Alloy block for
stopper mounting