E4000-90023+N67xx+dut+ps+installation.pdf.pdf - 第34页

1-30 N67xx DUT Power Supply Installation Verifying Operation 1 Look at the Testhead Config scr een and verify that the official configuration agr ees with the actua l configuration. 2 Run Diagnostics, especia lly th e DU…

100%1 / 40
N67xx DUT Power Supply Installation 1-29
Table 1-9 Default and alternative power supply mapping
Module 2
!supplies ps6751 5 to 8 asru channels 1 to 4
supplies ps6752 5 to 6 asru channels 1 to 4
!supplies ps6751 19 to 20 asru channels 5 to 6
!supplies ps6752 19 asru channels 5 to 6
supplies ps6746 19 asru channels 5
supplies ps6746 20 asru channels 6
!supplies ps6773 19 asru channels 5 to 6
Module 0
supplies ps6751 13 to 16 asru channels 1 to 4
!supplies ps6752 13 to 14 asru channels 1 to 4
!supplies ps6751 23 to 24 asru channels 5 to 6
supplies ps6752 23 asru channels 5 to 6
!supplies ps6746 23 asru channels 5
!supplies ps6746 24 asru channels 6
!supplies ps6773 23 asru channels 5 to 6
Module 3
supplies ps6751 1 to 4 asru channels 1 to 4
!supplies ps6752 1 to 2 asru channels 1 to 4
supplies ps6751 17 to 18 asru channels 5 to 6
!supplies ps6752 17 asru channels 5 to 6
!supplies ps6746 17 asru channels 5
!supplies ps6746 18 asru channels 6
!supplies ps6773 17 asru channels 5 to 6
Module 1
supplies ps6751 9 to 12 asru channels 1 to 4
!supplies ps6752 9 to 10 asru channels 1 to 4
!supplies ps6751 21 to 22 asru channels 5 to 6
!supplies ps6752 21 asru channels 5 to 6
supplies ps6746 21 asru channels 5
supplies ps6746 22 asru channels 6
!supplies ps6773 21 asru channels 5 to 6
1-30 N67xx DUT Power Supply Installation
Verifying Operation
1 Look at the Testhead Config screen and verify that the official configuration
agrees with the actual configuration.
2 Run Diagnostics, especially the DUT power supply tests, with a pin verification
fixture.
In Case of Difficulty
If you need phone support, go to www.keysight.com/find/contactus for contact
information.
If Diagnostics fails, verify that there are no shorting straps on
the terminals. Some supplies come from the factory with
shorting straps. They must be removed to do remote sensing.
Keysight i3070 In-Circuit Test System
N67xx DUT Power Supply Installation
Replacement Procedures
Replacing a Power Module 2-2
Replacing Connectors on Old Output Cables 2-4