1_H24维修手册.pdf - 第135页

E d it io n 5 .0 H 24 H ead R ep ai r T r ai n i n g T ext f o r S er vi ce E n g i n e e r Pro p e r D at a M e asu r em en t 13. Low er t he Z - ax i s t o t he l o w er m ec han i c al en d by hand. K ee p t he pos i …

100%1 / 214
Edition 5.0 H24 Head Repair Training Text for Service Engineer
Proper Data Measurement
8. The R-axis automatically rotates to holder B.
9. Measure the Z-axis upper position for holders B to X in the same way as for holder
A.
10. Press [OK] in X-holder for the last measurement to display the highest syringe in red.
11. The following display appears and then press [OK] to move the highest syringe to
the front of the head.
12. After the syringe highlighted in red has moved to the front of the head, the screen
changes to the upper end (mechanical end) position measurement screen. (the servo
for Z axis turns OFF.) Manually raise the Z-axis to the upper mechanical end and then
select [OK] to save the current servo count as proper data.
Axis move! Z position OK?
OK
The position where the
arm touches the bottom
of the lever is the upper
mechanical end.
Z-axis upper end proper data
mechanical end measurement
FK-9F50-08-0E 10-16 FUJI MACHINE MFG. CO., LTD
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8
Edition 5.0 H24 Head Repair Training Text for Service Engineer
Proper Data Measurement
13. Lower the Z-axis to the lower mechanical end by hand. Keep the position and
select [OK] to save the current servo count as proper data.
14. After the following message displays, raise the Z-axis by hand so that the gap is
balanced. (Be careful that the R-axis moves and syringe-A moves to the front.).
15. The Z-axis upper and lower mechanical end proper data measurements are now
complete.
16. Select [Next] to proceed to the Z0 measurement screen.
Axis move! OK?
OK
Z-axis lower mechanical end
proper data measurement
FK-9F50-08-0E 10-17 FUJI MACHINE MFG. CO., LTD
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8
Edition 5.0 H24 Head Repair Training Text for Service Engineer
Proper Data Measurement
17. After the Z-axis upper end and measurement is completed, a Head no connection
message displays. Remove the head once this message displays.
18. Attach the Z0 measurement jig (AA1WA01) to the module.
19. Set a dial gauge to zero on the underside of the jig. Be careful not to change the
zero on the dial gauge.
20. Remove the jig, attach the head and then select [ReStart].
Caution: Do NOT selectReStart before attaching the head. To start the
measurement again, turn OFF the power and then measure the proper data
from step 1.
Set the dial
to zero
Z0 measurement jig
AA1WA01
Z0 proper data measurement
FK-9F50-08-0E 10-18 FUJI MACHINE MFG. CO., LTD
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8