1_H24维修手册.pdf - 第173页
E d i ti o n 5 .0 H 24 H ead R ep ai r T r ai n i n g T ext f o r S er vi ce E n g i n ee r s Pr o p e r d at a m e a s u r e m e n t fo r H 2 4 h e a d u s i n g h e a d b e n c h 7. C l i c k [OK ] to ex e c ut e R - a…

Edition 5.0 H24 Head Repair Training Text for Service Engineers
Proper data measurement for H24 head using head bench
4. Attach the R-axis proper data measurement jig (2AGKNJ001600) on holder G and
holder S.
5. Refer to the arrow marks, and then align the R-axis position for MT-reset.
6. Click [Measure R-axis].
G
S
FK-9F50-08-0E S1-6 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8

Edition 5.0 H24 Head Repair Training Text for Service Engineers
Proper data measurement for H24 head using head bench
7. Click [OK] to execute R-axis MT-reset.
8. The following window displays on the monitor.
9. Attach the dial gauge, and slide the X-axis to check the parallelism between the G-
and S-holder. At this position, the servo counter should show 30,000±3,000 pulses.
For adjustment, loosen the R-axis motor coupling. (Tightening torque force: 0.4N.m)
R-axis coupling
G
S
FK-9F50-08-0E S1-7 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8

Edition 5.0 H24 Head Repair Training Text for Service Engineers
Proper data measurement for H24 head using head bench
10. Register the measurement position at step 9. Click “Register”.
11. Automatically calculate the R-axis Holder position for holders B to X.
12. Click [Next].
FK-9F50-08-0E S1-8 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8