1_H24维修手册.pdf - 第60页

E d i ti o n 5 .0 H 24 H ead R ep ai r T r ai n i n g T ext f o r S er v i ce E n g i n eer s R ep l aci n g th e Q - a x i s m o to r 3. Loos en t he f our c o upl i n g bol t s c on n ec t i ng t he Q - ax i s m ot or …

100%1 / 214
Edition 5.0
H24 Head Repair Training Text for Service Engineers
Replacing the Q-axis motor
Chapter 5 - Replacing the Q-axis Motor
The Q-axis motor replacement is explained below.
Note: Be sure to prepare a replacement motor with terminals attached.
Note: Q-axis proper data measurement is required following replacement of the Q-
axis motor.
5.1 Removing the Q-axis Motor
1. Remove the following cover.
2. Disconnect the connectors from the control board.
FK-9F50-08-0E 5-1 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8
Edition 5.0
H24 Head Repair Training Text for Service Engineers
Replacing the Q-axis motor
3. Loosen the four coupling bolts connecting the Q-axis motor coupling bolts and small
gear.
4. Remove the two bolts fixing the Q-axis motor, and then remove the motor.
5. Remove the cable ties used to secure the wires (3 locations)
FK-9F50-08-0E 5-2 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8
Edition 5.0
H24 Head Repair Training Text for Service Engineers
Replacing the Q-axis motor
6. Use the pin extractor jig (1276716-1, 234168-1) to extract the Q-axis motor power and
encoder wire terminals from the connector.
7. Removing the Q-axis motor is now complete.
234168-1
1276716-1
FK-9F50-08-0E 5-3 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8