1_H24维修手册.pdf - 第89页
E d i ti o n 5 .0 H 24 H ead R ep ai r T r ai n i n g T e xt f o r S er v i ce E n g i n eer s R e p l a c i n g a n d A d j u s ti n g th e S te p p i n g M o to r 7 . 5 A dj us t i ng t he S t e ppi ng M ot or P os i t…

Edition 5.0 H24 Head Repair Training Text for Service Engineers
Replacing and Adjusting the Stepping Motor
7.4 Attaching the Stepping Motor
1. Attach the stepping motor, tighten the 3 mounting bolts, and then connect the connector.
2. Attach the bracket with the screws, and then connect the 2 flat cables.
FK-9F50-08-0E 7-6 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8

Edition 5.0 H24 Head Repair Training Text for Service Engineers
Replacing and Adjusting the Stepping Motor
7.5 Adjusting the Stepping Motor Position
1. Lower the holder A spool valve by hand.
2. Move holder A to the Z-axis motor roller position by hand.
Motor roller
Spool valve for
syringe A
Syringe A
FK-9F50-08-0E 7-7 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8

Edition 5.0 H24 Head Repair Training Text for Service Engineers
Replacing and Adjusting the Stepping Motor
3. Click [Move to Upper Position] to raise the spool valve.
4. Check that the raised spool valve can be raised a little more by hand (there is some
extra upward stroke).
Manually push the spool valve
upward to check that there is a
small gap.
FK-9F50-08-0E 7-8 FUJI MACHINE MFG. CO., LTD.
CONFIDENTIAL
Downloaded at 2015/06/18 12:05:48 (JST) by 5LUF0998
(C) FUJI Machine Mfg. Co., Ltd. All Rights Reserved. 2015/06/18 doc3elPkSB8