4M184002w_F8S - 第120页
4OM-1840 1-4-45 1604-001 4.9.2 Ball Screw Cleaning and Oiling Cycle : Every 3 Months (Required Time : 10 minutes) Grease : DAPHNE GREASE MP No.1 Ball Screw Fig. 4A4-57 Procedure (1) W ipe old grease out using a rag. (2) …

4OM-1840
1-4-441604-001
4.9.1 Backup Table Upper Surface Cleaning
Cycle : Every Week (Required Time : 2 minutes)
Backup Table Upper Surface
Fig. 4A4-56
Procedure
Remove foreign substances and unrequired components and suck dirt and dust
with a vacuum cleaner.
Note
Either Y510mm or Y250mm single transfer unit can be selected when the system is
delivered from the factory.
4.9 PCB Positioning Section

4OM-1840
1-4-451604-001
4.9.2 Ball Screw Cleaning and Oiling
Cycle : Every 3 Months (Required Time : 10 minutes)
Grease : DAPHNE GREASE MP No.1
Ball Screw
Fig. 4A4-57
Procedure
(1) Wipe old grease out using a rag.
(2) Apply new grease on the screw shaft using a syringe.
Note
Perform the cleaning operation using the same procedure also in the system where the
Y510mm Single Transfer Unit (Factory option) has been mounted.
4.9 PCB Positioning Section

4OM-1840
1-4-461604-001
4.9 PCB Positioning Section
4.9.3 Ball Screw Spline Cleaning and Oiling
Cycle : Every 6 Months (Required Time : 10 minutes)
Grease : DAPHNE GREASE MP No.1
Grease Nipple
Ball Screw Spline
(Under side of Backup Table)
Fig. 4A4-57-1 Y510 mm Single Transfer Unit
Note
Either Y510mm or Y250mm single transfer unit can be selected when the
system is delivered from the factory.
Procedure
(1) Wipe out old great using a cloth.
(2) Attach the micro hose onto the hand grease gun and apply new grease from
the grease nipple.
Note
The nozzle to be used should be SPK-3C.
Fig. 4A4-57-2