4OM-1840 1-4-52 1604-001 4.1 1 Nozzle Stocker Section Nozzle Storage Section Every Month Cleaning Shutter Flange Pin Sliding Section Every 3 Months Cleaning and Lubrication (MOLYNOC GREASE AP1) Required Time: 5 minutes N…

100%1 / 315
4OM-1840
1-4-511604-001
4.10.3 PCB Detection Sensor Cleaning
Cycle : Every Week (Required Time : 2 minutes)
PCB Detection Sensor
The light receiving section is
located inside these sections
in the figure.
Fig. 4A4-63
Procedure
Clean the PCB detection sensor light emitting and receiving sections using a rag.
Note
Perform the cleaning operation using the same procedure also in the system where the
Y510 mm Single Transfer Unit (Factory option) has been mounted.
4.10 Conveyor Section
4OM-1840
1-4-521604-001
4.11 Nozzle Stocker Section
Nozzle Storage Section
Every Month Cleaning
Shutter Flange Pin Sliding Section
Every 3 Months Cleaning and Lubrication
(MOLYNOC GREASE AP1)
Required Time: 5 minutes
Nozzle Stocker Sliding Section
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Fig. 4A4-65
4.11 Nozzle Stocker Section
4OM-1840
1-4-531604-001
4.11.1 Shutter Flange Pin Sliding Section
Cycle : Every 3 Months (Required Time : 5 minutes)
Grease : MOLYNOC GREASE AP1
Shutter Flange Pin Sliding Section
Fig. 4A4-66
Procedure
 
(2) Apply new grease using a syringe.
4.11 Nozzle Stocker Section