Operating Manual - 第35页
4022 591 960 62 Operating Manual 02.0 2 FCM Mu ltif lex 33 Current Pr ogram Selection Check nozzle type on each pl a cement module by set-up list . FIGURE 53 FIGURE 54 P A 2747/00 P A 2747/20 P A 2747/30 P A 2747/40 P A …

4022 591 96062 Operating Manual
02.02 FCM Multiflex 32
Current Program Selection
2. Follow instructions.
FIGURE 51
6.3 Check Nozzles
FIGURE 52

4022 591 96062 Operating Manual
02.02 FCM Multiflex 33
Current Program Selection
Check nozzle type on each placement module by set-up list.
FIGURE 53
FIGURE 54
PA 2747/00 PA 2747/20 PA 2747/30
PA 2747/40 PA 2747/50 PA 2747/60
PA 2748/10 PA 2748/20
PA 2748/30
FIGURE 55

4022 591 96062 Operating Manual
02.02 FCM Multiflex 34
Off Line Preparation
CHAPTER 7 Off Line Preparation
In case of an error, call for assistance
1. Print the set-up list of the new product (out of the PPS system) and
according to the set-up list:
2. Prepare the nozzle set.
FIGURE 56
3. Prepare the Multiflex board support.
FIGURE 57
PA 2747/00 PA 2747/20 PA 2747/30
PA 2747/40 PA 2747/50 PA 2747/60
PA 2748/10 PA 2748/20
PA 2748/30
4. Take a production board (next product) for width adjustment &
calibration purposes.
FIGURE 58
5. Load the feeders. (See Chapter 2.7.3: Feeder Handling).
FIGURE 59
6. Place the feeders in the feeder trolley (see Chapter 2.7.3.1: Feeder
Exchange).
FIGURE 60