INFINITY +286(.((3,1 * 0$1$* (0(17 ,1)250$7,21 9,(:(5 7.18 User Manual Software Versi on 7 Analysis Information The table below compares the SEMI E10-96 specification, SEMI Standard for the Definition and Measure ment…

INFINITY
+286(.((3,1*
0$1$*(0(17,1)250$7,219,(:(5
Software Version 7 User Manual 7.17
5. Select OK, to close the window and access the management information.
6. Use the scroller on the right to view all the data. A complete list of all the
data is shown below.
NOTE
The name, under the heading Machine, is the PC name. The default is the
machine serial number, ie DEK 122354.
MTB(x) = Mean Time Between (x)
MCB(x) = Mean Cycles Between (x)
Where (x) is A = Assist
Where (x) is F = Failure
Where (x) is I = Interrupt
Infinity.man
Machine
Productive State
Equipment State (hours (%))
Equipment Reliability (hours)
Equipment Reliability (cycles)
File Summary
Time captured
Location
Name
Assist
Failure
Cycle
Interrupt
Productive
Standby
Engineering
Sched. Downtime
Unsched. Downtime
Non Sched.
Total
MTBA
MTBF
MTBI
MCBA
MCBF
MCBI
Size
Number of events
First event
Last event
Standard
27/06/2000 04:37
SLANGHAM1
29
94
2613
123
31.02 (19.24)
116.82 (72.44)
0.0 (0.0)
4.55 (2.82)
8.87 (5.5)
0.0 (0.0)
161.26 (100.0)
1.07
0.33
0.25
90
27
21
1048544
16912
07/06/2000 00:10
13/06/2000 17:25
SEMI-E10

INFINITY
+286(.((3,1*
0$1$*(0(17,1)250$7,219,(:(5
7.18 User Manual Software Version 7
Analysis
Information
The table below compares the SEMI E10-96 specification, SEMI Standard for
the Definition and Measurement of Equipment Reliability, with those used by
DEK on their printing machines.
Productive State The period of time when the equipment is performing its intended function.
Standby State The period of time, other than non-scheduled time, when equipment is in a
condition to perform its intended function, but it is not operational, ie no product
available.
Engineering State The period of time when the equipment is in a condition to perform its intended
function, but is operated to conduct engineering experiments, ie process devel-
opement.
Scheduled
Downtime
The period of time when the equipment is not available to perform its intended
function due to planned downtime events.
• Maintenance Delay - Waiting for maintenance personnel, parts or manage-
ment decision.
• Production Test
• Preventive Maintenance
• Set Up
• Facilities Related - Environmental; House hook-up - Air/Power; Commu-
nications links with other equipment
Unscheduled
Downtime
The period of time when the equipment is in production, but normal production
has been halted other than for a scheduled downtime event, ie equipment failure.
Non Scheduled The period of time when the equipment has not been scheduled to be utilized in
a productive role, ie weekends, unworked shifts and holidays.
The terminology is defined in the SEMI-E10 96 standard.
SEMI Process State DEK Printer Process State
Productive State Running
Standby State Waiting Ready
Engineering State No Equivalent
Sched. Downtime Set Up, Maintenance
Unsched. Downtime Down, Recovery
Non Sched. Machine Switched off

INFINITY
+286(.((3,1*
0$1$*(0(17,1)250$7,219,(:(5
Software Version 7 User Manual 7.19
Saving A File 1. Select File, the following window is displayed:
2. Select Save As, the following window is displayed:
3. With the stylus enter a file name using the keyboard and select OK.
Confirmation is sought if overwriting an existing file.
The file is given a .man extension unless specified otherwise.