Process Lens PL Service Manual_EN - 第119页
3 Replacing spare parts Se rv ic e Ma nu al P ro ce ss L en s PL - 0 3/ 20 25 11 9 3.5.2.2 Changing the conveyor motor Parts 03110463-xx BLM-6080-24 motor Equipment and tools ● Allen key size 4.0 Requirements ● Machine i…

3 Replacing spare parts
118 Service Manual Process Lens PL - 03/2025
Fig.162: Conveyor belt
► Check the tension of the belt at the meas-
urement point (1) using a tension meter.
The tension should be 250 +/- 10 Hz.
► The steps for the other conveyor system
are the same.
Installation
Follow the removal instructions in reverse order for installation.
Check the function of the conveyor belt
Requirements
●
Machine is switched on.
●
Inspection circuit board is placed at the beginning of the machine.
Fig.163: “Unit Function” tab
► Go to the diagnostic page.
► Click on the tab Unit function(1).
► Go to the section Conveyor(2).
► Click the button PCB In(3) and the button
PCB Out(4).

3 Replacing spare parts
Service Manual Process Lens PL - 03/2025 119
3.5.2.2 Changing the conveyor motor
Parts
03110463-xx BLM-6080-24 motor
Equipment and tools
●
Allen key size 4.0
Requirements
●
Machine is switched off.
Fig.164: Overview of the conveyor motor
1. Conveyor motor belt
2. Conveyor motor
3. Width adjustment belt
4. Width adjustment motor
Fig.165: TSP400
► Disconnect the connectors(1) for the con-
veyor motor from the TSP400(2).

3 Replacing spare parts
120 Service Manual Process Lens PL - 03/2025
Fig.166: Conveyor motor (from back)
► Unscrew the 4 screws(1) using an Allen
Key size 4.0.
► Take off the conveyor motor belt(3).
► Take out the motor of the machine.
Fig.167: Conveyor motor
► Unscrew the screw(3) off the gear(2) of
the old motor(1) and replace it onto the
new motor using an Allen Key size 4.0.
► Put the motor back in place.
► Put the belt on and tighten the screws.
► Connect the connectors to the TSP400.
Installation
Follow the removal instructions in reverse order for installation.
Check the function of the conveyor motor
Requirements
●
Machine is switched on.
●
Circuit board is placed at the beginning of the machine.