00197463-03_SM_CPP_Customer_EN - 第52页

5 Front plate, star, Z axis and smoothed distributor disc 5.4 Removing the valve terminal (only for heads from FS05 upwards) 52 Service Manual SIPLACE Multistar (CPP / CPP M) 02/2018 Fig.75: Fastening the valve terminal…

100%1 / 120
5 Front plate, star, Z axis and smoothed distributor disc
5.4 Removing the valve terminal (only for heads from FS05 upwards)
Service Manual SIPLACE Multistar (CPP / CPP M) 02/2018 51
Installation
Fig.72: Checking the seal
Check the position of the seal.
Fig.73: Checking the ball bearings
Check the ball bearings.
These ball bearings may not protrude above the
surface.
 NOTICE!
If the ball bearings are defective, you will
need to replace the valve terminal.
.
Fig.74: Inserting the valve terminal
Place the valve terminal on the star carrier.
Pay attention to the correct position of the pins
and to the position of the Flexprint cable.
5 Front plate, star, Z axis and smoothed distributor disc
5.4 Removing the valve terminal (only for heads from FS05 upwards)
52 Service Manual SIPLACE Multistar (CPP / CPP M) 02/2018
Fig.75: Fastening the valve terminal
1. The old valve terminal [03082217‑xx] is fixed with
six screws to the heads up to and including
FS04.
2. The new valve terminal [03115167‑xx] is fixed
with five screws to the heads up to number [KL-
J5-0162] .
3. The new valve terminal [03115167‑xx] is fixed
with six screws to heads from number [KL-
J5-0162].
Fasten the valve terminal with the screws
provided.
Tighten the screws crosswise with a torque of
0.17 +/- 0.03Nm.
Fig.76: Flexprint cable
1. Connector closed
2. Connector open
3. Flexprint removed
Insert the Flexprint cable as far as the stop into
the connector and lock the connector.
Follow the removal instructions in reverse order for further installation.
Also observe the installation instructions in the following sections:
5.6 "Replacing the energy transmission for the rotor [03068843‑xx]" [}63]
5.2 "Removing and fitting the star (only for heads from FS05 upwards)" [}43]
5.1 "Replacing the front plate [03061102-xx]" [}35]
Observe in particular the torques specified!
5 Front plate, star, Z axis and smoothed distributor disc
5.5 Replacing the Single Core Solution (SCS)[03054790Sxx] (only for heads fromFS05)
Service Manual SIPLACE Multistar (CPP / CPP M) 02/2018 53
5.5 Replacing the Single Core Solution (SCS)[03054790Sxx]
(only for heads fromFS05)
Parts, equipment and tools
SCS assembly CPP [03054790Sxx]
Overview
Fig.77: Star structure
1. Energy transmission for rotor
2. Valve terminal
3. Star carrier with DP drives
4. Single Core Solution (SCS).
5. Holding circuit with screwed joint
Fig.78: SCS
The SCS consists of two boards, the power and the
control module.
See also:
5.5.1 "Power module for 12 DP drives
[03054771‑xx]" [}58]
5.5.2 "Control module for 12 DP drives
[03054784‑xx]" [}60]
 NOTICE!
Heads up to FS04
The SCS is not replaced in heads up to and in-
cluding FS04.
.
Preparation
Remove the head from the machine. For details about removing and fitting the placement
head, refer to the service manual for your machine.
fit the head on the head mount [03056231‑xx].
Make sure that the component sensor protective cap is fitted.
1.1.3 "Protecting the component sensor" [}8]