Schedule
The monthly schedule consists of two modules each taking approximately 2
hours to complete. Each process of the maintenance programme is only
described in enough detail to act as guidance to those ASM authorized person-
nel using it. These modules are to be carried out by ASM authorized personnel
who have successfully completed the ASM Maintenance Course.
It is recommended that this manual is stored away as the maintenance record
of the machines’ service history.
Disposal of Waste
Materials
All waste materials including fluids and contaminated materials must be dis-
posed of in accordance with national, federal or local legislation.
Warranty The monthly maintenance schedule must only be performed by ASM mainte-
nance trained personnel to prevent damage to the machine and maintain a valid
warranty.
Compliance with the preventive maintenance procedures described in this
manual is an essential element of the machine warranty policy as defined in the
‘ASM Standard Warranty Statement’.
It is highly recommended that the maintenance schedule is followed outside the
warranty period to maintain the machine in top working condition and to
maintain accuracy. Extra Maintenance Manuals can be ordered from DEK
Spares quoting the part number on the front cover of this manual.
PREVENTIVE MAINTENANCE
CLEANING AND LUBRICATION
1.4 Maintenance Manual Chapter Issue 2, July 16
CLEANING AND LUBRICATION
MANDATORY
TOXIC CHEMICALS MAY BE PRESENT. SAFETY GLOVES MUST BE WORN.
MANDATORY
TOXIC CHEMICALS MAY BE PRESENT. EYE PROTECTION MUST BE WORN.
Cleaner Part Numbers
Lubrication Chart
Linear Bearings
and Guide Rails
All linear bearing blocks, fitted to the machine, are greased for life and require
no greasing although a grease nipple may be fitted.
The linear bearing guide rails require no maintenance unless they become
contaminated. In the event of contamination, carry out the following procedure:
1. Clean the linear bearing guide rail using a plastic spatula.
2. Remove any build up of grease around the linear bearing block.
3. Apply a very thin coating of THK AFB grease along the whole length of the
guide rail using a cloth. Ensure that the three exposed faces are greased to
prevent surface rust.
Description Part Number
IPA Impregnated Wipes 115806
IPA Impregnated Swabs 115846
Plastic Spatula (white) 173737
Plastic Spatula (green) 173788
Plastic Spatula (black) Antistatic 173825
Module Description Lubricant Part Number
Camera X and Y Linear Bearing Guide Rails THK AFB Grease 141146
Omni Track Bearings Light Oil 120008
Print Carriage Linear Bearing Guide Rails THK AFB Grease 141146
Rail System Linear Bearing Guide Rails THK AFB Grease 141146
Rising Table Ballscrew THK AFB Grease 141146
Stencil Actuator Bearings Light Grease 120011
Stencil Actuator Striker Plates Light Grease 120011
Spindle Shafts THK AFB Grease 141146
Squeegee Leadscrews and Supernuts Lubricant Grease 187599
Transport Rail Ballscrews THK AFB Grease 141146
Manual Tooling Plate Light Oil 120008
PREVENTIVE MAINTENANCE
CLEANING AND LUBRICATION
Chapter Issue 2, July 16 Maintenance Manual 1.5
4. Remove any surplus grease using the cloth ensuring that there is no build
up of grease near the linear bearing block.
For locations of linear bearings, refer to the table below:
Ballscrews The rising table and transport rail ballscrews are greased for life and require no
maintenance unless they become contaminated. In the event of contamination,
carry out the following procedure:
1. Clean the ballscrew using a plastic spatula.
2. Remove any build up of grease around the ballscrew bearing block.
3. Apply a very thin coating of THK AFB grease along the whole length of the
ballscrew using a cloth.
4. Using the cloth, remove any surplus grease near the ballscrew bearing
blocks.
Location Linear Bearing Guide Rails Linear Bearing Blocks
Camera 3 (2 Y and 1 X) 5
Paste Dispenser 2 2
Print Carriage 2 3
ProFlow 2 2
Rising Table 2 4
Transport Rails 6 6
Under Stencil Cleaner Uses the 2 Camera Y Rails 2