Dek-265GSX-User-Manual - 第30页
11. Select Calibrat Heights (F2). The message ‘Ensure that the correct squeegees are fitted’ is displayed. Calibrat Heights 12. Select Continue (F1). The message ‘Calibrating pressure heights - DO NOT Open Covers !’ is d…

7. Fit the front squeegee onto the front squeegee mount, ensuring that the
thumbscrews are only finger tight.
8. Lower the front printhead cover.
9.
Press the System button.
10.
Select Continue (F1).
Continue
Software Version 6 User Manual 1.13
MACHINE PROGRAMMING
STAGE 4A

11.
Select Calibrat Heights (F2). The message ‘Ensure that the correct
squeegees are fitted’ is displayed.
Calibrat
Heights
12.
Select Continue (F1). The message ‘Calibrating pressure heights - DO
NOT Open Covers !’ is displayed.
Continue
13.
Select Exit (F8).
Exit
14.
Select Exit (F8).
Exit
1.14 User Manual Software Version 6
MACHINE PROGRAMMING
STAGE 4A

STAGE 4B
ProFlow Setup If squeegees were used whenrunningthe last product, carry outtheSqueegees to
ProFlow Replacement Procedure, see Technical Reference Manual, ProFlow
Module Chapter - Replacement Procedures.
For setting the contact and downstop positions, carry out the ProFlow Contact
Position Setup, see Technical Reference Manual, ProFlow Module Chapter -
Adjustments and Settings.
Software Version 6 User Manual 1.15
MACHINE PROGRAMMING
STAGE 4B