DEK高级培训资料 - 第155页
Cyclone paper roll changeov er • Minimal interruption of line beat • Off-line cassette repleni sh – Paper roll loade d in adv ance – Cassette sn aps into place <20 sec onds • Change paper Issue 2: July 2007 • Change p…

Cyclone cleaning
• Bi-directional, active cleaning
– Lateral oscillation (scrub) during traverse
•
5-stage cleaning head
– Five active surfaces clean on
every stroke
Issue 2: July 2007
– Four vacuum vents
•
Fully programmable
– Wet, dry, vacuum and paper feed
•
High speed
– Faster traverse velocity
– Effective and efficient two sweep cleaning
•
High flow vacuum system
– Large capacity, active carbon filtration

Cyclone paper roll changeover
•
Minimal interruption of line beat
• Off-line cassette replenish
– Paper roll loaded in advance
– Cassette snaps into place <20 seconds
•
Change paper
Issue 2: July 2007
•
Change paper
– Without unloading stencil(only front justified screens)
– With ASM at minimum width

Cyclone Cleaner Tasks
•
Remove Cyclone assembly from
machine and disassemble
•
Issue 2: July 2007
machine and disassemble
•
Perform cleaner height and level
adjustment
•
Test under screen cleaner performance
Objective 29: Complete the workbook tasks