SM482PLUS_Maintenance(Eng_Ver2.7).pdf - 第30页
Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer SM482PLUS Maintenance Handbo ok 2-5 Monthly Inspections (1/2) Che ck-up List Maint enance Cycl e Referen ce Time requ ired Per iod No Inspectio…

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-4
Weekly Inspections
Inspection Items for Maintenance

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Maintenance
Cycle
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean
Cleaning liquid, Air gun, Ultra
fine fiber cloth
30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean
Cleaning liquid, Cotton Swab,
Ultra fine fiber cloth
10 Minutes
M-3 Cover Cooling Fan Inspect and clean
Crosshead screwdriver,
Vacuum cleaner
10 Minutes
M-4 Cover Cooling Fan Filter Inspect and clean Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
ㆍ The part inspection and replacement interval shall be set up based on the specified operation environment.
ㆍ If the conditions for operation are poor, the part inspection and replacement interval may be reduced.
ㆍ In the above table, C/S means our designated C/S company or our overseas local agents.
ㆍ Consumables should be purchased for a fee, regardless of the warranty period.
Monthly Inspections (1/2)

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance