SM482PLUS_Maintenance(Eng_Ver2.7).pdf - 第31页

Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer SM482PLUS Maintenance Handbo ok 2- 6 Monthly Inspections (1/2) Inspection It ems for Maint enanc e

100%1 / 78
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Maintenance
Cycle
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean
Cleaning liquid, Air gun, Ultra
fine fiber cloth
30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean
Cleaning liquid, Cotton Swab,
Ultra fine fiber cloth
10 Minutes
M-3 Cover Cooling Fan Inspect and clean
Crosshead screwdriver,
Vacuum cleaner
10 Minutes
M-4 Cover Cooling Fan Filter Inspect and clean Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
The part inspection and replacement interval shall be set up based on the specified operation environment.
If the conditions for operation are poor, the part inspection and replacement interval may be reduced.
In the above table, C/S means our designated C/S company or our overseas local agents.
Consumables should be purchased for a fee, regardless of the warranty period.
Monthly Inspections (1/2)
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-7
Monthly Inspections (2/2)
Check-up List
Maintenance Cycle Grease Spec.
Time
required
Period No Inspection Item Measures Tools
Monthly
M-5
Head Ball Spline, LM
Guide, Mirror CAM
Clean and apply grease
Ultra-fine fiber cloth, Flat
Brush, Syringe
Apply grease period: 3 months
Ball Spline : AFF-70
LM Guide Rail, Mirror CAM
: GADUS S2 V220-2
30 Minutes
M-6
X Frame LM Guide,
Ball Screw
Clean and Lubrication
Utra-fine fiber cloth,
Lubricator
Lubrication period: 4 months AFE-CA 60 Minutes
M-7 Y Frame LM Guide Clean and Lubrication
Utra-fine fiber cloth,
Lubricator
Lubrication period: 2 months AFE-CA 60 Minutes
M-8 Y Frame Ball Screw Clean and Lubrication
Utra-fine fiber cloth,
Lubricator
Lubrication period: 2 months AFE-CA 20 Minutes
M-9
X Axis, Y Axis Flat
Cable
Inspect and apply grease Utra-fine fiber cloth Apply grease period: 3 months KS-63W 20 Minutes
M-10
Conveyor LM Guide,
Lead Screw
Cleaning, apply grease,
Lubrication
Utra-fine fiber cloth, Flat
Brush, Lubricator
Apply grease period: 2 months GADUS S2 V220-2 30 Minutes
M-11 Cover Cleaning
Utra-fine fiber cloth,
Ethyl alcohol, Heavy Duty
Staticide #2005, #2001
Inspection period: 1 months 15 Minutes
Setting the replacement period for parts
The part inspection and replacement interval shall be set up based on the specified operation environment.
If the conditions for operation are poor, the part inspection and replacement interval may be reduced.
In the above table, C/S means our designated C/S company or our overseas local agents.
Consumables should be purchased for a fee, regardless of the warranty period.
Monthly Inspections (2/2)