00192791-02 - 第52页
2 Ceramic S ubstrate Centering Unit User Manual S IPLACE HS-50 2.4 Weekly Maintenance Software Version SR.502.xx 01/01 Issue 52 &KHFNLQJWK H 5ROOHUR QW KH ) L[H G6WRS Å Check to see if there is any damage t o…

User Manual 2 Ceramic Substrate Centering Unit
Software Version SR.502.xx 01/01 Issue 2.4 Weekly Maintenance
51
7RROV$X[L OLDU\7HVW( TXLSPHQWDQG( [SHQGDEOH 0DWHU LDOV
– Vacuum cleaner (with suitable nozzle)
– Tweezers
– If applicable, Cross-slotted screwdriver, size 1
– If applicable, Seeger pliers for shaft circlip ring
– If applicable, roller for fixed stop, Item no. Art.-Nr. 00347284-01
– If applicable, screw to fasten the roller, M3 x 8 DIN 965 (Item no. 00095305-01)
– If applicable, tension spring for flat cylinder, Item no. 00359769-01
– If applicable, circlip for spring suspension pin, Item no. 00048315-01
3UHSDUDWRU\ 6WHSV
Å Establish the maintenance condition of the machine and the accessibility of the work area.
Proceed as described for the cleaning of the PCB conveyor in the section "Weekly Mainte-
nance", in the "Maintenance Manual for HS-50".
&OHDQLQJWKH6OL GH*XLGH
Components located in the positioning range of the slide guide of the ceramic substrate centering
unit may result in incorrect centering or to an error message and stoppage of the placement pro-
cess -> Proximity switch signal for "Centering unit open" is not actuated.
Å Thoroughly vacuum off the slide guide in the front area (see Fig. 2.4 - 1 -> Pos. 3) and in the
area of the end stop, at back (see Pos. 1).
Å Remove the jammed component with tweezers.
Å Push the slide of the centering unit (see Pos. 2) all the way against the back stop and thor-
oughly vacuum off the portion of the slide guide that is now exposed at the front.
Å The make certain that the slide moves smoothly.
Å It must be possible to open the centering unit entirely (as far as the stop on the back) and to
close it entirely.
If you note a problem with the tension spring during this process, resume with the work in Sec-
tion 1.

2 Ceramic Substrate Centering Unit User Manual SIPLACE HS-50
2.4 Weekly Maintenance Software Version SR.502.xx 01/01 Issue
52
&KHFNLQJWK H5ROOHUR QW KH ) L[HG6WRS
Å Check to see if there is any damage to the surface (contact area of substrate) of the stationary
roller of the fixed stop (see Fig. 2.4 - 1 -> Pos. 4).
Å If there is an error, unscrew the screw fastening the roller (1 cross-slotted screw M3 x 8 DIN
965).
Å If the circumference of the roller is still in satisfactory condition, turn the roller,
until the satisfactory surface is pointing toward the substrate, then tighten the cross-slotted
screw M3 x 8 to fasten the roller.
Å If the roller no longer has a satisfactory surface, use the cross-slotted screw M3 x 8 to fasten
the new roller ,Item no. 00347284-01, in place.
&KHFNLQJWKH7HQVLRQ6SULQJ
If the tension spring on the flat cylinder of the mechanical ceramic substrate centering unit is faulty
or is mounted incorrectly, this may result in an error message accompanied by the stoppage of the
placement run -> Proximity switch signal for "Centering unit open" is not issued.
Å Check whether the open ceramic substrate centering unit is still being held securely at the end
stop (= maximum "open" position) by the tension spring (see Fig. 2.4 - 1 -> Pos. 5).
Å If applicable, suspend both ends of the spring correctly or, if the tension spring is damaged,
install a new one as follows:
Å Use the Seeger circlip pliers to remove the grip ring (see Fig. 2.4 - 1 -> Pos. 6) from the
spring suspension pin.
Å Unhook the faulty spring at both ends.
Å Suspend the new tension spring, Item no. 00359769-01 from both ends and install the cir-
clip (new, if applicable), Item no. 00048315-01 on the spring suspension pin.

User Manual 2 Ceramic Substrate Centering Unit
Software Version SR.502.xx 01/01 Issue 2.5 Monthly Maintenance
53
0RQWKO\0DLQWHQDQFH
DANGER
In addition to these instructions, you will always need the current edition of the "Maintenance Man-
ual for HS-50", Item no. 00191375-02, to restore the machine to its original safe condition in terms
of maintenance and to perform all of other the jobs specified for this maintenance period.
During all maintenance work, comply with the safety instructions in Chapter 1 of the above-men-
tioned "Maintenance Manual for HS-50". It also contains the explanation for the symbols used.
Perform the maintenance work described while conducting the "Vacuuming Off the PCB Con-
veyor" described below during the monthly maintenance work on the "Mechanical Ceramic Cen-
tering Unit".
The maintenance must be performed on ALL of existing centering units (see Fig. 2.3 - 1).
([SHQGDEOH0DWHULDOV
For the monthly maintenance you need:
– SIPLACE cleaning cloth, Item no. 00315253-01
3UHSDUDWRU\ 6WHSV
Å Establish the maintenance condition of the machine and the accessibility of the work area.
Proceed as described for the cleaning of the PCB conveyor in the section "Weekly Mainte-
nance", in the "Maintenance Manual for HS-50".
&OHDQLQJDQG$SSO\LQJ3 UHVHUYDWLYHWR6OLGH*XLGH
Å Clean the entire length of the contact surfaces of the slide guide for the ceramic substrate cen-
tering unit with a new SIPLACE cleaning cloth. This simultaneously applies a thin coat of oil to
the contact surfaces.