N7201A616E00_0317 - 第102页

NPM-W 2 EJM7DE-MB-02O-0 0 First layer Second layer Third layer Fourth layer 2-2-2 -1 Operator mode 1 Compo- nent names Menu configur a tion 1 Operating procedure 2-2-2 Production start Starts automatic production. Adjust…

100%1 / 714
NPM-W2 EJM7DE-MB-02O-00
2-2-1-10
Preparation
NPM-W2 EJM7DE-MB-02O-00
First layer Second layer Third layer Fourth layer
2-2-2-1
Operator mode 1
Compo-
nent
names
Menu configuration 1
Operating procedure
2-2-2
Production start
Starts automatic production.
Adjustment soft switch
Temporarily changes the operating environment to debug the machine.
Production
menu
(before
production)
Remaining monitor
Checks information on the component shortage of each table in line.
Checks pickup status.
Pickup monitor
Status monitor
Displays production information during operations, parts shortages and
other status.
Production
menu
(during
production)
Inspection monitor
Displays inspection status during operation.
Continuous preparation
Controls individual preparation before production, per process.
Handles files; for example, loading machine data and saving machine
parameters.
File operation
Preparation
menu
Changes the operation mode.
Operation mode change
Home menu
*1)
*2)
*1)
*2)
*1)For single lane mode
For alternate mode on the dual lane mode
*2)For independent mode on the dual lane mode
*1)
*2)
NPM-W2 EJM7DE-MB-02O-00
First layer Second layer Third layer Fourth layer
2-2-2-2
Displays machine data at each nozzle position.
Material
preparation
Nozzle (placement head)
Displays production data and the
feeder status in color.
Checks feeder status.
Checks the correction values
obtained from pickup position learning
during production, per feeder address.
Feeder
Operates the transcription unit.
(displayed when the transcription unit is mounted)
Checks production data and the tray
status in color.
Checks tray status.
Checks the correction values
obtained from pickup position learning
during production, per tray address.
Tray
Conveyor
Replaces the PCB support pin unit.
Displays PCB positions, and transfers
PCBs from their respective positions.
Adjusts rail width.
Calculates the consumption of components relative to the planned volume in
advance.
Production plan
Exchanges a nozzle (including a syringe).
Nozzle (dispensing head)
Checks the pos./No. of support pins (for
automatic change). (displayed when
automatic change specifications are
selected for the support pin)
Preparation