N7201A616E00_0317 - 第109页
NPM-W 2 EJM7DE-MB-02 O-00 First layer Second layer Third layer Fourth layer 2-2-2 -8 Maintenance operations Consumable pa rts rep lacement Periodic inspection Checks the inspection items and work history of each cycle. D…

NPM-W2 EJM7DE-MB-02O-00
First layer Second layer Third layer Fourth layer
2-2-2-7
Engineer mode 2
Compo-
nent
names
Menu configuration 4
Operating procedure
2-2-2
Material
preparation
Preparation
menu
Conveyor
Replaces the PCB support pin unit.
Displays PCB positions, and transfers
PCBs from their respective positions.
Adjusts rail width.
Calculates the consumption of components relative to the planned volume in
advance.
Production plan
Pickup
information
Displays information on
operating time per stage.
Displays up to 20 emergency stop errors in chronological
order, with the most recent first.
Stop history
Displays the latest 50 errors in the vacuum sensor that
occurred during automatic operation in chronological order.
History
Displays component pickup
information.
Operating
information
Vacuum sensor error history
Production
information
menu
Displays the latest 50 errors in the dummy dispensing
recognition that occurred during automatic operation in
chronological order.
Dummy dispensing recognition error history (Dispensing head)
Displays dispensing (including
dummy dispensing) information.
Dispensing information
Tray
Checks production data and the tray
status in color.
Checks tray status.
Checks the correction values
obtained from pickup position learning
during production, per tray address.
Checks the pos./No. of support pins
(for automatic change). (displayed
when automatic change specifications
are selected for the support pin)

NPM-W2 EJM7DE-MB-02O-00
First layer Second layer Third layer Fourth layer
2-2-2-8
Maintenance
operations
Consumable parts replacement
Periodic inspection
Checks the inspection items and work history of each cycle.
Displays the consumable parts replacement information.
Accuracy verification result
Displays accuracy verification results.
Maintenance
menu
XY unit
Carries out maintenance operations on the XY unit.
Head
Carries out maintenance operations on heads.
Carries out maintenance operations on PCB transfer.
Tray
Carries out maintenance operations on the tray feeder.
(Displayed when the tray feeder is installed)
Conveyor
Pickup monitor Displays component pickup
information.
Displays component inspection
information.
Inspection
information
Head (dispensing head)
Carries out maintenance operations on the dispensing head.
(Displayed when the dispensing head is installed)
Preparation

NPM-W2 EJM7DE-MB-02O-00
First layer Second layer Third layer Fourth layer
2-2-2-9
Engineer mode 3
Compo-
nent
names
Menu configuration 5
Operating procedure
2-2-2
PCB
Feeder
Production
data menu
Data
modification
Placement
Checks and modifies
production data.
Pattern
Tray
Dispensing
(Dispensing
head)
Checks the component list used in
the table.
Checks the component shape data
used in the table.
Enters and modifies the dispensing
condition data used in the table.
Checks and modifies pattern attribute
data.
Checks and modifies group attribute
data.
Enters and modifies the tray-related
data including tray sizes and pitches.
Configures pallet and feeder settings.
Enters and modifies component
shape data.
Enters and modifies placement
condition data.
Checks and modifies PCB warpage
data.
Configures pallet and feeder settings.
Enters and modifies component
shape data.
Enters and modifies placement
condition data.
Checks and modifies PCB data.
Checks and modifies PCB recognition
data.
Checks and modifies support pin
(for automatic change) data.