N7201A616E00_0317 - 第292页
NPM-W 2 EJM7DE-MB-04O-0 0 1 1 A NG position on a PCB is displayed on the map. B The inspection result information is displayed on a per-compone nt basis. C Displays the next ( second) p age. D The inspection result infor…

NPM-W2 EJM7DE-MB-04O-00
4-4-2-2
Flow direction arrow
(Displayed only during selecting the
machine)
Blue:
Not waiting for process.
Yellow:
Waiting for process or reloading.
F
Component
inspection
Inspection result
G
H
Displayed when the machine is equipped
with the inspection head, or when the
ejection conveyor is placed just behind
the machine.
●Based on the inspection result on the
last PCB unloaded from the machine,
either of OK/NG is displayed.
●When a PCB comes to rest on the
ejection conveyor, the background
color turns yellow.
PCB marker
(Displayed while the machine is selected)
Displayed at the top right corner of the
screen when any defects are found on
PCB during inspection.
Yellow: when PCB inspection results
include any NG.
Light blue: when PCB inspection results
include any NG placement.
●When NG placement coincides with
NG, the marker is displayed in yellow
that is used in preference to light blue.

NPM-W2 EJM7DE-MB-04O-00
1
1
A
NG position on a PCB is displayed on the
map.
B
The inspection result information is
displayed on a per-component basis.
C
Displays the next (second) page.
D
The inspection result information is
displayed on a per-feeder basis.
E
The inspection result information is
displayed on a per-head basis.
Inspection information display
A B C
■First page
■Second page
D E G
2
F
H
2
Choose a display item
F
The inspection result information is
displayed on a per-nozzle basis.
G
Displays the previous (first) page.
H
Switches the screen to the detailed.
Inspection monitor 1
Operating procedure
4-4-3
Produc-
tion
4-4-3-1
Error information collected in LNB can be checked on screen or via the production information menu on a
production-line or per-machine basis during production. The error information cannot be displayed without
establishing connection to LNB.
2

NPM-W2 EJM7DE-MB-04O-00
4-4-3-2
Component
inspection