N7201A616E00_0317 - 第432页
NPM-W 2 EJM7DE-MB-06 O-00 6-2-1 -1 ■ For dual lane 1 Select a lane :Lane 1 1 Describes how to operat e productio n data teach. : Lane 2 Produc- tion data teaching Bef ore star ting teac hing operations 1 Operating proced…

NPM-W2 EJM7DE-MB-06O-00
Explains how to check the production data.
●All the data, including unchangeable and hidden data, that influence production are targeted for checking.
●Depending on the settings, some data will not be checked.
6-1-22
Check result
A B C
D
F
E
C
A
B
Detail
D
E
Detailed information
Data name
Returns to the previous screen.
F
Error information
A
A
D
●Pressing this button shows details
in .
Data
editing
Data check
Normal
Shows the previous or next table.
Detailed of the selected error in .
A
Abnormal
Choose the error to display detail
information.
Operating procedure
6-1-22
Setting
change

NPM-W2 EJM7DE-MB-06O-00
6-2-1-1
■For dual lane
1
Select a lane
:Lane 1
1
Describes how to operate production data teach.
: Lane 2
Produc-
tion data
teaching
Before starting
teaching operations 1
Operating procedure
6-2-1

NPM-W2 EJM7DE-MB-06O-00
6-2-1-2
Setting
change