N7201A616E00_0317 - 第494页

NPM-W 2 EJM7DE-MB-06O-0 0 6-2-9 -17 Produc- tion data teaching Placement coor dinates teac h 9 Operating procedure 6-2-9 T eaching by specifying component position 1 1 Perform steps from through in [T eaching w ith compo…

100%1 / 714
NPM-W2 EJM7DE-MB-06O-00
6-2-9-16
Setting
change
7
+
Align the cross line to the ‘top’ of the
component electrode.
Align the cross line to an
electrode on the PCB
8
See the step of [Teaching with
component (measuring method: 2 point)]
7
+
8
Repeat three times steps from
to
4 8
9
If measurement is ,
Perform steps and ,
changing from [Top] to [Right].
5 7
If measurement is ,
Perform steps and ,
changing from [Top] to [Bottom].
5 7
If measurement is ,
Perform steps and ,
changing from [Top] to [Left].
5
7
10
Perform steps from through
in [Teaching with component
(measuring method: 2 point)]
10 13
7
NPM-W2 EJM7DE-MB-06O-00
6-2-9-17
Produc-
tion data
teaching
Placement coordinates
teach 9
Operating procedure
6-2-9
Teaching by specifying component position 1
1
Perform steps from through
in [Teaching with component
(measuring method: 1 point)]
1
7
2
2
4
Confirm the message
5
with
Choose
5
Perform on both and .
4
When you do not want to transition to
the component position selection
screen
3
3
+
NPM-W2 EJM7DE-MB-06O-00
6-2-9-18
Setting
change
6
When a component is picked
up to the nozzle manually
7
To
+
When a component is picked
up to the nozzle automatically
14
To
+
7
Prepare for component
installation
8
9
10
11
12
Open the safety cover
Servo switch OFF
Install components
Close the safety cover
13
Confirm the message
13
6
Servo switch ON