00197455-01_IM_TX150SS8_en - 第21页
Installing Prim ergy TX 150 S8 with W indows S erver 20 12 07/2012 Edit ion 21 The D epl oyment P rocess S election s creen ap pears. Figure 3-8 : Deployment Process Selecti on screen ► Ensure that the ra dio butto n bes…

Installing Primergy TX150 S8 with Windows Server 2012 07/2012 Edition
20
After initialization, the Installation Manager main screen will be displayed.
Figure 3-7: Installation Manager main screen
► Select the Deployment option by clicking on it.

Installing Primergy TX150 S8 with Windows Server 2012 07/2012 Edition
21
The Deployment Process Selection screen appears.
Figure 3-8: Deployment Process Selection screen
► Ensure that the radio button besides Typical is selected and click the Next button at the bottom
of the screen.

Installing Primergy TX150 S8 with Windows Server 2012 07/2012 Edition
22
The Configure your Unattended Operating System Installation screen appears.
Figure 3-9: Unattended Operating System Installation Configuration screen with Windows Server 2012 Foundation selected
► In the dropdown boxes, select Windows, MS Windows Server 2012, Windows Server 2012
Foundation as displayed in the figure above.
► Click the Next button at the bottom of the screen.