F-52 2. Consumables to Be Replaced at 700-Day (Recommended) Intervals Summary of this sectio n This section describes co nsumables to be replaced at 700-da y intervals. Section No. Titl e Contents 2-1 Replacing the Spind…

100%1 / 720
F-51
1-8-3. Completion of replacing the Y-axis section roll cover
Procedures for completion of replacing the Y-axis section roll cover
Step No. Do This
(Continued from the previous section.)
1
Reinstall the partition (left).
2
Close the cover [P] and secure it with the retaining screw.
3
Reinstall the cover [A].
4 [When there is maintenance space provided at the rear
side of the machine]
Reinstall the cover [R].
5
Open the facility main air valve.
6
Turn On the facility power.
7
Open the circuit breaker lever lockout and then turn ON the
circuit breaker.
8
Insert the key into the main switch and then turn ON the main
switch.
F-52
2. Consumables to Be Replaced at 700-Day
(Recommended) Intervals
Summary of this section
This section describes consumables to be replaced at 700-day intervals.
Section No. Title Contents
2-1 Replacing the Spindle
Coolant Water Flow Rate
Sensor
- Procedures for replacing the
spindle coolant water flow rate
sensor
2-2 Replacing the Solenoid
Valve
- Procedures for replacing the
solenoid valve
F-53
2-1. Replacing the Spindle Coolant Water Flow Rate
Sensor
Operation flow
The procedure for replacing the flow rate sensor of the spindle coolant water
consists of the following steps.
2-1-1 Removing the machine outer cover
2-1-2 Replacing the flow rate sensor
2-1-3 Completion of replacing the flow rate sensor
Before replacing
Have on hand the following items before replacing.
Phillips screwdriver
2.5 mm Allen wrench
4mmAllenwrench
14 mm Wrench