DFD6361-Maintenance - 第665页

F-95 4-1-3. Com pletion of replaci ng the flo wmeter Procedur es for c ompleti on of replaci ng the flo wmeter W ARNING - If you operate the m achine whi le the machin e interior or floor is w et with water, you may rece…

100%1 / 720
F-94
4-1-2. Replacing the flowmeter
Procedures for replacing the flowmeter
CAUTION
The bracket contains pipes for the flowmeter and switch harnesses.
In the removal of the bracket, exercise care not to pull it strongly with
undue force.
Step No. Do This
(Continued from the previous section)
1
Unscrew the retaining screws of the bracket.
Retaining screws Retaining screws
Bracket
Flowmeter
2
Remove the bracket slowly, being careful not to unplug the
junctions at the backside of the bracket.
3
Disconnect the piping and joints of the flowmeter..
4
Remove the flowmeter.
5
Mount the new flowmeter to the bracket.
Part Name Part No.
Flowmeter MOHEH056--C
6
Connect the removed piping to the new flowmeter.
7
Reinstall the bracket in its original position.
Continued in the next section.
F-95
4-1-3. Completion of replacing the flowmeter
Procedures for completion of replacing the flowmeter
WARNING
- If you operate the machine while the machine interior or floor is wet
with water, you may receive electric shock that could result in
serious injury or death.
If the machine or floor is wet with water, do not turn ON the facility
power source until it dries.
- Upon the completion of flowmeter replacement, turn ON the wheel
coolant system to make sure that no water leakage occurs. If you
operate the machine while the machine interior or floor is wet with
water, you may receive electric shock that could result in serious
injury or death.
If any water leakage is found, shut off the facility power supply and
then properly install the piping again.
Step No. Do This
(Continued from the previous section)
1
Make sure that there is no water leakage inside the machine.
2
Reinstall the cover [U] in its original position.
- For the cover installation procedure;
See the section B-1-6, [Mounting Machine Outer Covers] of
Installation Manual.
3
Open the facility main valve of the wheel coolant water.
4
Turn ON the facility power source.
5
Open the circuit breaker lever lockout and turn ON the circuit
breaker.
6
Insert the key into the main switch and turn ON the main switch.
7
Press the <System Initial> button to effect system initialization.
8
Adjust the flow rate.
9
Start the machine and conduct dummy cutting for more than 30
minutes.
- Make sure that no water leakage occurs from the flowmeter
piping joint.
- When the water leakage occurs;
Repeat the steps 4-1-1 through 4-1-3 of this chapter.
F-96
4-2. Replacing the Hard Disk Drive
About replacement of the hard disk drive
Replacement of the hard disk drive must be carried out by Disco Service
engineers.
When it becomes necessary to replace the hard disk drive, contact your nearest
Disco Service office.