00900330-01_UM_ASM-ProcessLens_EN - 第6页
6 Instruction manual ASM ProcessLens 03/2021 Table Of Contents 5.1.2 Description .. 76 5.2 Switching on/off the ASM ProcessLens .. 79 6 Preventive Maintenance .. 81 6.1 Safety instructions .. 82 6.1.1 Safety inst…

5Instruction manual ASM ProcessLens 03/2021
Table Of Contents
3.2.2 Ambient conditions for packaging, transportation and storage.. 54
3.2.3 Center of Gravity.. 54
3.2.4 Electrical Ratings.. 54
3.2.5 Conveyor specifications.. 55
3.2.6 Inspection capabilities.. 55
3.2.7 Solder paste inspection capabilities.. 55
3.2.8 Program generation specifications.. 55
4 Setting up and commissioning.. 57
4.1 Transport and delivery configuration.. 57
4.1.1 Shipping packaging.. 57
4.1.1.1 Transporting environment condition.. 57
4.1.1.2 Shipping packaging dimensions.. 57
4.1.1.3 Weight of machine when ready for dispatch.. 57
4.1.2 Checking a delivery.. 58
4.1.3 Configuration when delivered.. 58
4.1.4 Transporting the machine in the crate.. 59
4.1.4.1 Services.. 59
4.1.4.2 Safety instructions.. 59
4.1.4.3 Means of transport.. 59
4.1.4.4 Forklift attachment points on the transport crate or pallet.. 59
4.1.5 Transporting the machine without a crate or pallet.. 59
4.1.5.1 Safety instructions.. 59
4.1.5.2 Means of transport.. 60
4.1.5.3 Forklift attachment points on the machine.. 60
4.1.5.4 Points that MUST be noted when transporting the machine.. 61
4.2 Infrastructure at the installation location.. 62
4.2.1 Recommendations for foundation quality.. 62
4.2.1.1 Maximum ground levelness.. 62
4.2.1.2 Machine weight and floor loading.. 62
4.2.2 Main power supply.. 62
4.2.2.1 Checking the main power supply.. 62
4.2.2.2 Power supply cable - specification.. 62
4.2.2.3 Mains connection - delivery configuration.. 63
4.3 Setting up the machine.. 64
4.3.1 Warning instructions.. 64
4.3.2 Lifting and transporting the machine with the forklift truck.. 65
4.3.3 Fitting attached parts.. 66
4.3.3.1 Checking and setting the protective cover switch.. 66
4.3.3.2 Fitting the tower lamp.. 66
4.3.3.3 Fixing the monitors.. 66
4.3.4 Tools and equipment.. 67
4.3.5 Adjusting the machine height.. 67
4.3.5.1 Presetting the height of the machine feet.. 68
4.3.6 Levelling the machine.. 69
4.3.7 Removing the corrosion protection from the guide rails.. 70
4.4 Commissioning the machine.. 70
4.4.1 Commissioning the machine at the installation site.. 70
4.4.2 Removing the shipping braces.. 70
5 Working with the machine.. 75
5.1 Controls and displays.. 76
5.1.1 Overview.. 76

6 Instruction manual ASM ProcessLens 03/2021
Table Of Contents
5.1.2 Description.. 76
5.2 Switching on/off the ASM ProcessLens.. 79
6 Preventive Maintenance.. 81
6.1 Safety instructions.. 82
6.1.1 Safety instructions for hazardous substances.. 82
6.2 Maintenance tasks overview.. 83
7 Options.. 85
7.1 UPS Option.. 85
7.2 External barcode scanner.. 85
7.2.1 Conveyor rail extension.. 86
8 Annex.. 87
8.1 EU Declaration of conformity.. 87
8.1.1 ASM ProcessLens Single-Lane (701000).. 88
8.1.2 ASM ProcessLens Dual-Lane (702000).. 90

1 Introduction
1.1 Machine overview
Instruction manual ASM ProcessLens 03/2021 7
1 Introduction
This instruction manual contains basic information that must be observed when setting up, operat-
ing and maintaining the ASM ProcessLens® solder paste inspection machine (Single-lane and
Dual-lane). This instruction manual contains notes that must be observed to guarantee your per-
sonal safety and to avoid damage to equipment.
NOTICE
The ASM ProcessLens® solder paste inspection machines are of largely identical design.
Any differences will be mentioned specifically.
The diagrams in this instruction manual show the ASM ProcessLens Dual-lane. These dia-
grams also apply in principle to the ASM ProcessLens Single-lane. Additional diagrams will
be shown for any deviations.
This document is the original instruction manual.
1.1 Machine overview
Fig.1: ASM ProcessLens solder paste inspection machine