ACT - Accuracy Check Tool - 第186页

ACT with SSW 7xx / User Manual 07/2017 Edition 78 4.2.8 Finishing the ACT – Returning to Producti on 4.2.8.1 Finishing (e.g. under Stati on Software 7xx) ► Click the Schließen (Close) button in the measurement result s v…

100%1 / 220
ACT with SSW 7xx / User Manual 07/2017 Edition
77
In the Line Diagnostics – Administration windows, select the Collect Maintenance Reports
& Logbook function under Options.
Figure 4-54: Collect Maintenance Reports & Logbook
The reports collected by the stations are displayed in the C:\Maintenance Reports folder.
Figure 4-55: Maintenance Reports
Example:
Figure 4-56: Accuracy Check Report
ACT with SSW 7xx / User Manual 07/2017 Edition
78
4.2.8 Finishing the ACT Returning to Production
4.2.8.1 Finishing (e.g. under Station Software 7xx)
Click the Schließen (Close) button in the measurement results view to close it.
Figure 4-57: Closing measurement results view
Load the board into the output section (1).
Figure 4-58: Loading board into the output section
Click on the button to the left at the bottom (2) to return to the main view of the GUI.
ACT with SSW 7xx / User Manual 07/2017 Edition
79
In the station main view you will now see the board highlighted in red in the output section,
from where you can remove it.
Remove the board from the output section.
If it is not possible to remove the board, because it is a machine of the SX- or DX-series that is
positioned in the middle of a line of several machines, then click on the red board.
Figure 4-59: State after ACT
In the next window, select the Cancel board option.
Select the sub-function Remove from last station of the line.
Click OK to confirm.
Figure 4-60: Removing board from the last station of the line
Press Start.
The board is unloaded from the station.