Preventive Maintenance
1-1
Chapter 1. Preventive Maintenance
1.1. Maintenance Procedure(ce model)
The following procedures should be performed before doing any maintenance task.
1. Check to see if all the operations of the equipment are terminated.
2. Turn off the Isolation Switch.
3. Turn off the Main Circuit Breaker.
4. Perform the maintenance tasks according to the directions explained in the following
sections. .
After completing the maintenance tasks, please follow the procedures outlined below in
order to operate the equipment properly.
1. Check to see if there are any abnormal substances in the maintenance area, and if any,
remove them.
2. Make sure that all the parts are re-assembled properly.
3. Turn on the Main Circuit Breaker.
4. Turn on the power of the equipment according to the procedures mentioned in power
inspection.
5. Confirm that the equipment is operated normally without any problem.
Samsung Component Placer CP45FV Series Maintenance Reference
Warning
Please turn off the Main Switch in the right lower cover
of rear side before performing any maintenance related
tasks. Loss of human life may occur if proper safety
measures are not taken.
OFF
Main Switch
1.2. Environmental conditions
1.2.1. Requirements for air pressure
Pressure
Primary pressure: 0.5 ~ 0.7 MPa
Secondary pressure: 0.45 ~ 0.55 MPa
Air Consumption: Maximum 160 N /min
Dry Air: air dew point of -17 or less
1.2.2. Power requirements
Voltage
Single phase AC 220 V ±10 %
AC 100 V ±10 % / 110 V±10 % / 120 V±10 % / 200 V±10 % / 220
V±10 %/ 240 V±10 % (shall be changed the terminal of the transformer)