00197815-04_JC_PM_WF2_SX12_EN - 第15页

1 WF2 SX1/2 Check the head status, remove tables (COT), exchange nozzles and shut down machine 1.5 min 1 / 3 C A U T I O N !  R e f e r t o s a f e t y i n s t r u c t i o n s i n u s e r m a n u a l b e f o r e c o m m…

100%1 / 86
www.asm-smt.com
Head Exchange Kit - Overview
1 WF2 SX1/2 Check the head status, remove tables (COT), exchange nozzles and shut
down machine
1.5 min 1 / 3
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status ON Transport Empty
NOTICE! ESD guidelines are to be followed Tool: Wear Part:
W1, W2, W3, W58, W63
Consumables:
www.asm-smt.com
1 Stop production and click on " Block con-
veyor ".
2 Block all lanes and click "OK". 3 Click on "Maintenance".
4 Select all heads. 5 Click on "Nozzle reference run". 6 Click on "Generate report".
1 WF2 SX1/2 Check the head status, remove tables (COT), exchange nozzles and shut
down machine
1.5 min 2 / 3
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status ON Transport Empty
NOTICE! ESD guidelines are to be followed Tool: Wear Part:
W1, W2, W3, W58, W63
Consumables:
www.asm-smt.com
7 Enter name and comment and click on
"Save".
8 Click on "Prepare for head exchange and
shutdown".
9 Click on "Shut down".
10 Remove all COT. 11 Open all covers. 12 Remove all nozzle magazines with
ceramic nozzles.