00197815-04_JC_PM_WF2_SX12_EN - 第60页
19 WF2 SX1/2 Appendix: CPP head exchange 3 min 2 / 4 C A U T I O N ! R e f e r t o s a f e t y i n s t r u c t i o n s i n u s e r m a n u a l b e f o r e c o m m e n c i n g M a i n t e n a n c e Machine Status OFF Tr…

19 WF2 SX1/2 Appendix: CPP head exchange 3 min 1 / 4
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status OFF Transport Empty
NOTICE! ESD guidelines are to be followed Tool:
T58, K01
Wear Part: Consumables:
www.asm-smt.com
1 Move the gantry with the head to be main-
tained to the end limit.
2 Put on the corresponding component
sensor protection.
3 Unplug the 3 air hoses from the head.
4 Disconnect both ribbon cables. 5 Loosen the screws holding the strain relief
(HotLink only).
6 Unplug both camera cables (HotLink only).

19 WF2 SX1/2 Appendix: CPP head exchange 3 min 2 / 4
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status OFF Transport Empty
NOTICE! ESD guidelines are to be followed Tool:
T58, K01
Wear Part: Consumables:
www.asm-smt.com
7 Open the camera cable clip (GigE only). 8 Release the plug lock and unplug the two
camera cables (GigE only).
9 Loosen the 4 screws fixing the head.
10 Take the head from the hook. 11 Put the head into the transport container. 12 Take the maintained head out of transport
container.

19 WF2 SX1/2 Appendix: CPP head exchange 3 min 3 / 4
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status OFF Transport Empty
NOTICE! ESD guidelines are to be followed Tool:
T58, K01
Wear Part: Consumables:
www.asm-smt.com
13 Place the head at the hook. 14 Insert the 4 screws to fix the head and
fasten them with a torque of 2.7Nm.
15 Connect both camera cables (HotLink
only).
16 Fasten the screws holding the strain relief
(HotLink only).
17 Connect the two camera cables (GigE
only).
18 Close the camera cable clip (GigE only).