00197815-04_JC_PM_WF2_SX12_EN - 第64页
20 WF2 SX1/2 Appendix: TH head exchange 6.25 min 2 / 5 C A U T I O N ! R e f e r t o s a f e t y i n s t r u c t i o n s i n u s e r m a n u a l b e f o r e c o m m e n c i n g M a i n t e n a n c e Machine Status OFF …

20 WF2 SX1/2 Appendix: TH head exchange 6.25 min 1 / 5
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status OFF Transport Empty
NOTICE! ESD guidelines are to be followed Tool:
T87, K01
Wear Part: Consumables:
www.asm-smt.com
1 Move the gantry with the head to be main-
tained to the end limit.
2 Loosen the 2 screws holding the camera
visual shield.
3 Disconnect the ribbon cables from the
right head segment.
4 Unplug the 3 air hoses from the right head
segment.
5 Remove the 3 screws fixing the right head
segment.
6 Hold the segment firmly, remove the last
screw and take the segment away.

20 WF2 SX1/2 Appendix: TH head exchange 6.25 min 2 / 5
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status OFF Transport Empty
NOTICE! ESD guidelines are to be followed Tool:
T87, K01
Wear Part: Consumables:
www.asm-smt.com
7 Put the segment into the transport con-
tainer.
8 Unplug the 3 air hoses from the left head
segment.
9 Disconnect the ribbon cables from the left
head segment.
10 Remove 3 screws fixing the left head seg-
ment.
11 Hold the segment firmly, remove the last
screw and take the segment away.
12 Put the segment into the transport con-
tainer.

20 WF2 SX1/2 Appendix: TH head exchange 6.25 min 3 / 5
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status OFF Transport Empty
NOTICE! ESD guidelines are to be followed Tool:
T87, K01
Wear Part: Consumables:
www.asm-smt.com
13 Take the left head segment out of the
transport container.
14 Hold the segment firmly to the left position
of the mounting plate and secure it with 1
screw.
15 Insert the missing 3 screws to the seg-
ment and fix them slightly.
16 Fasten all screws with a torque of 2.7Nm. 17 Connect the 3 air hoses to the segment. 18 Connect the ribbon cables to the segment.