SEMI E130-1104 © SEMI 2003, 2004 48 R1-1.9 Scenario IX – Pre-align F a ils on Subsequent Subst rate. User Clears Condit ion Prior to the Host Issui ng the Next LOAD-SUBSTRATE Command — The prober fails to pre-align a s u…

100%1 / 7923
SEMI E130-1104 © SEMI 2003, 2004 47
R1-1.8 Scenario VIII – Pre-align Failure on 1
st
Substrate — The prober fails to setup the 1
st
substrate of a job (the
chuck is unoccupied). The user manually aligns substrate and presses Start on the prober console to resume
processing.
Host Prober
PJ01: SETTING UP to PROCESSING()
Load Substrate()
PS: AWAITING COMMAND to HANDLING MATERIAL()
Alarm Notification(Pre-align Failed)
Pre-align Failure()
PS: HANDLING MATERIAL to PROCESSING BLOCKED(Pre-align Failed)
User
Manually align Substrate()
Start()
PS: PROCESSING BLOCKED to HANDLING MATERIAL()
Proceed as normal
Alarm Cleared(Pre-align Failed)
Figure R1-22
Pre-Align Failure on 1
st
Substrate Scenario
SEMI E130-1104 © SEMI 2003, 2004 48
R1-1.9 Scenario IX – Pre-align Fails on Subsequent Substrate. User Clears Condition Prior to the Host Issuing the
Next LOAD-SUBSTRATE Command — The prober fails to pre-align a substrate while the host is processing a
substrate on the main chuck. The user manually aligns the substrate and presses Start on the prober console to clear
the alarm. The next LOAD-SUBSTRATE command from the host proceeds as normal.
Host Prober User
Load Substrate()
Move substrate to Pre-align
Pre-align
Load Substrate on Chuck
Align and Profile
Move Next Substrate to Pre-align
PS: AWAITING LOAD to HANDLING MATERIAL()
PS: HANDLING MATERIAL to AWAITING COMMAND
Pre-align Failure
Alarm Notification (Pre-align Failed)
Load Substrate()
Process Substrate()
Manually align Substrate
Start
PS: AWAITING COMMAND to HANDLING MATERIAL()
Proceed as normal
Alarm Cleared (Pre-align Failed)
Figure R1-23
Pre-Align Failure 2 – Alarm Cleared by User
SEMI E130-1104 © SEMI 2003, 2004 49
R1-1.10 Scenario X – Pre-align Fails on Subsequent Substrate. User Fails to Clear the Condition Prior to the Host
Issuing the Next LOAD-SUBSTRATE Command — The prober fails to pre-align a substrate while the host is
processing a substrate on the main chuck. The user manually aligns the substrate but fails to complete the manual
alignment prior to the host issuing the LOAD-SUBSTRATE command. The Process State model transitions to the
PROCESSING BLOCKED state until the user clears the alarm. When the alarm is cleared, the Process State model
transitions to the HANDLING MATERIAL state and processing resumes as normal.
Host Prober User
Load Substrate
Move substrate to Pre-align
Pre-align
Load Substrate on Chuck
Align and Profile
Move Next Substrate to Pre-align
PS: AWAITING LOAD to HANDLING MATERIAL
PS: HANDLING MATERIAL to AWAITING COMMAND
Pre-align Failure
Alarm Notification (Pre-align Failed)
Load Substrate
Process Substrate
Manually align Substrate
Start
PS: HANDLING MATERIAL to PROCESSING BLOCKED(Pre-align Failed)
Proceed as normal
PS: PROCESSING BLOCKED to HANDLING MATERIAL()
Alarm Cleared(Pre-align Failed)
Figure R1-24
Pre-Align Failure 3 – User Failed to clear Alarm
R1-1.11 Scenario XI – Correlation Substrate Testing
R1-1.11.1 Overview — This scenario describes the use of a correlation substrate. The correlation substrate is
loaded on the chuck to verify the test results for the current setup. From the Process/Control Job perspective,
correlation substrate testing is a normal task available to the host. Therefore, there are no job related collection
events associated with correlation testing.
R1-1.11.1.1 The correlation substrate is not part of a Process Job. The correlation substrate must be run using the
same recipe as the currently loaded process job.
R1-1.11.2 Pre-Conditions
R1-1.11.2.1 Job Setup — See Section R1-1.1.2.1
R1-1.11.2.2 Job Start See Section R1-1.1.2.2.