Gemini Semi Appendix Manual - 第36页
INSTALLATION APPENDIX PRE POWER UP CHE CKS 2.18 Appendix to Micron Technical Manuals Chapter Issue 1 Feb 15

INSTALLATION APPENDIX
PRE POWER UP CHECKS
Chapter Issue 1 Feb 15 Appendix to Micron Technical Manuals 2.17
7. Connect the two probes of a digital volt meter (DVM) together and ensure
that the DVM is reading 0Ω.
8. Measure the resistance between the earth tag and all three isolator mount
securing screws ensuring that all measurements are less than 0.5Ω.
9. Remove the front and rear covers of the machine.
10.Measure the resistance between the following points ensuring that all
measurements are less than 0.5Ω:
a. PC earth stud and a securing screw that secures the PC to the machine
frame.
b. M36 earth stud and a securing screw that secures the M36 to the machine
frame.
c. M37 earth stud and a securing screw that secures the M37 to the machine
frame.
d. M39 earth stud and a securing screw that secures the M39 to the machine
frame.
11. Refit the front and rear covers.
12.Refit the terminal cover.
13.Refit the mains isolator cover.
14.Refit the Front Left Hand Lower Corner Panel.

INSTALLATION APPENDIX
PRE POWER UP CHECKS
2.18 Appendix to Micron Technical Manuals Chapter Issue 1 Feb 15

Appendix to Micron Technical Manuals
APPENDIX C
Technical Reference
Information