00195377-0102 - 第33页

在线预览 00195377-0102 PDF 文档。

100%1 / 34
Retrofit instructions: Flexible dual conveyor, SIPLACE D4
04/2007 Edition
32
: Position conveyor rail 3 (conveyor rail 2 for the fixed side on the left) using the width adjustment
(SITEST) and the "Conveyor fixed side panel, setup gauge, DC/SC HS60/D4 (item no.:
03054248-) step by step at the width of 251.7 mm.
2
: Change to SITEST (level Service) to the menu "transport 2 options and configuration => refe-
rence position fixed rail => teach => step by step 100µm".
The adjustment units connect.
: Lay the gauge into the input conveyor between transport rail (belt support) 1 and 3 / 4 and 2.
Inlay the spring and fix the fixing screw of the brake (input and outpur conveyor).
Control the value 251.7mm with the gauge.
: Save the positions of the fixed conveyor rail.
2
2
: Position the other conveyor rails parallel to this one and fix them using the spring and the
clamping screw.
: To check the PCB conveyor, travel the conveyor to 216 mm and insert the test PCB (item no.
00359535-01) in the PCB conveyor. Run the PCB through the entire PCB conveyor.
: Switch to Gantry functions and then to the "Calibrate conveyor edges" menu to calibrate the
PCB reference corner position. This has to be done for both conveyor tracks and placement
areas.
: Save the machine data and exit the SIITEST program.
: Restart the placement system.
Item no. / Artikel-Nr.: 00195377-0102 ASM Assembly Systems GmbH & Co. KG
Rupert-Mayer-Strasse 44
81379 München
Germany
www.siplace.com