4OM-1505-004_w.pdf - 第58页
4OM-1505 1-7 1. Outline of Maintenance : Chap.1 Device Name Inspection, Cleaning, and Lubricating Spots Work Maintenance Cycle Daily Weekly Monthly Every 3 Months Every 6 Months 5 Y ears 3.2.4 PEC Recognition Section PCB…

4OM-1505
1-6
1. Outline of Maintenance : Chap.1
1.3 Items for Periodic Maintenance
The items (inspection, cleaning, lubrication, etc.) that require periodic
maintenance are classied and described based on each individual devices.
Reference
Refer to "2. Maintenance Check List" for the maintenance based on frequency
of use.
Notice
The * -marks represent that the items require maintenance only for the
rst time.
Follow the
-marked maintenance cycle for the subsequent use.
Device Name
Inspection, Cleaning, and
Lubricating Spots
Work
Maintenance Cycle
Daily
Weekly
Monthly
Every 3
Months
Every 6
Months
5 Years
3.2.1
Air Source
Drain Cleaning
3.2.2
Squeegee Head Section
Squeegeee Cleaning
Recognition Lighting Glass
Surface
Cleaning
Squeegeee Head
Y-Axis Linear Guide
(Left Side), (Right Side)
Cleaning
Lubrication
Stencil Recognition
X-Axis Linear Guide
Cleaning
Lubrication
Guide Bushing for Squeegee
Up/Down Movement
Cleaning
Lubrication
Squeegee Head Y-Axis Ball
Screw
Lubrication
Stencil Recognition X-Axis
Ball Screw
Lubrication
3.2.3
Stencil Holder Section
Stencil Printing Pattern Cleaning
Upper Surface of Stencil
Holder
Cleaning
Lower Surface of Stencil Cleaning
Stencil Y-Axis Linear Guide
(Front Side), (Rear Side)
Cleaning
Lubrication
Stencil Y-Axis Ball Screw
Lubrication
0906-001

4OM-1505
1-7
1. Outline of Maintenance : Chap.1
Device Name
Inspection, Cleaning, and
Lubricating Spots
Work
Maintenance Cycle
Daily
Weekly
Monthly
Every 3
Months
Every 6
Months
5 Years
3.2.4
PEC Recognition Section
PCB Warpage Top Holder
(Plunger Front End Section)
Cleaning
PCB Stopper Cleaning
Recognition Lighting Glass
Surface
Cleaning
PEC Recognition
X-Axis Linear Guide
Cleaning
Lubrication
PEC Recognition
Y-Axis Linear Guide
(Front Left Side),
(Front Right Side),
(Rear Side)
Cleaning
Lubrication
PCB Stopper Guide Bushing
Lubrication
PEC Recognition
X-Axis Ball Screw
Lubrication
PEC Recognition
Y-Axis Ball Screw
Lubrication
3.2.5
Conveyor Section
L conveyor Upper Surface
of PCB Transfer Belt
Cleaning
R conveyor Upper Surface
of PCB Transfer Belt
Cleaning
Linear Guide for L
Conveyor Width Change
Cleaning
Lubrication
Linear Guide for R
Conveyor Width Change
Cleaning
Lubrication
0906-001

4OM-1505
1-8
1. Outline of Maintenance : Chap.1
0906-001
Device Name
Inspection, Cleaning, and
Lubricating Spots
Work
Maintenance Cycle
Daily
Weekly
Monthly
Every 3
Months
Every 6
Months
5 Years
3.2.6
PCB Chuck Section
Upper Surface of PCB
Transfer Belt
Cleaning
PCB Positioning Side and
Upper Surface
Cleaning
Upper Surface and Pin Hole
Section of Backup Table
Cleaning
Backup Table Z-Axis
Guide Bushing
Cleaning
Lubrication
Linear Guide for Chute
Width Adjustment
(Left Side), (Right Side)
Cleaning
Lubrication
Linear Guide for
PCB Clamping
Cleaning
Lubrication
Trapezoid Screw for
Chute Width Change
(Left Side), (Right Side)
Lubrication
Backup Table Z-Axis
Ball Screw
Lubrication
3.2.7
Table Section
Table X-Axis Linear Guide
(Front Left Side),
(Front Right Side),
(Rear Side)
Cleaning
Lubrication
Table Z-Axis
Guide Bushing
Cleaning
Lubrication
Table θ-Axis Linear Guide Cleaning
Lubrication
Table θ-Axis Movable
Bearing Outer
Circumference
Cleaning
*
Table X-Axis Ball Screw
Lubrication
Table Z-Axis Ball Screw
Lubrication
Table θ-Axis Ball Screw
Lubrication
3.2.8
Cleaning Section
Hose and Hose Joint Check,
Cleaning
Solvent Tank, Solvent Pan,
and Hose Joint
Check,
Cleaning