NPM Calibration Manual-En - 第32页
NPM Maint en anc e E di ti on 9.7 Pl ac ement Load EJM9BE-M B-09M-21 Page 9-31 9.7 Placement Load Thi s procedur e i s e x clusiv e to the 2- nozzle head. 1 Adj ust the conveyor w idth to 120 m m. 2 Press . 3 Press [M ou…

NPM
Maintenance Edition
9.6 Placement Position / Conveyor
Page 9-30 EJM9BE-MB-09M-21
The following explains the dual lane mode.
1
Press .
2
Press [Mnt Pos/Conv].
3
Press + [Jig install].
The support blocks descend, and the
width-adjustment axis moves.
4
Turn OFF the servo switch.
5
Open the safety cover.
6
Set the placement-height teaching
jigs.
•
It should be set with its right end fit to the right
end of the PCB clamp.
∗
Set both the lane 1 and the lane 2 to the right
end.
7
Close the safety cover.
8
Turn ON the servo switch.
The subsequent steps are the same as step 15
and later for the single conveyor type.
∗
The screen for removing the support-pin
height jigs will not be displayed. (Because it is
not used in dual lane mode.)
UnitCalibConveyorPCBPos-15E00
1
2
3

NPM
Maintenance Edition
9.7 Placement Load
EJM9BE-MB-09M-21 Page 9-31
9.7 Placement Load
This procedure is exclusive to the 2-nozzle head.
1
Adjust the conveyor width to 120 mm.
2
Press .
3
Press [Mount load].
4
Select a table.
∗
Select the target table for calibration.
5
Press + [Jig install].
UnitCalibHeadLoad-01E02
2
3
UnitCalibHeadLoad-01E02
5
4

NPM
Maintenance Edition
9.7 Placement Load
Page 9-32 EJM9BE-MB-09M-21
6
Press + [OK].
•
The head moves to the retraction position.
7
Turn OFF the servo switch.
8
Open the safety cover.
9
Set the load measuring jig.
∗
The load measuring jig should be pressed
against the rail’s reference side and set with
its right end fit to the right end on the PCB
clamp of the conveyor.
Load measuring jig
Load measuring jig
Fit
UnitCalibHeadLoad-02E01
6