NPM Calibration Manual-En - 第41页

NPM Maint en anc e E di ti on 9.7 Pl ac ement Load Page 9-40 EJM9BE-M B-09M-21 42 Press + [OK]. 43 Press + [OK]. • T he head mov es to the r etracti on positi on. 44 Turn OFF the se rvo switch. 45 Open the s afety cover.…

100%1 / 99
NPM
Maintenance Edition
9.7 Placement Load
EJM9BE-MB-09M-21 Page 9-39
36
Press + [OK].
The head moves to the working position.
37
Turn OFF the servo switch.
38
Open the safety cover.
39
Detach the nozzles.
40
Close the safety cover.
41
Turn ON the servo switch.
UnitCalibHeadLoad-17E01
36
NPM
Maintenance Edition
9.7 Placement Load
Page 9-40 EJM9BE-MB-09M-21
42
Press + [OK].
43
Press + [OK].
The head moves to the retraction position.
44
Turn OFF the servo switch.
45
Open the safety cover.
46
Remove the load measuring jig.
UnitCalibHeadLoad-19E01
43
UnitCalibHeadLoad-18E01
42
NPM
Maintenance Edition
9.7 Placement Load
EJM9BE-MB-09M-21 Page 9-41
47
Close the safety cover.
48
Turn ON the servo switch.
49
Press + [OK].
After the head moves to the origin position,
the screen selected in step 35 is displayed.
UnitCalibHeadLoad-20E01
49