NPM Calibration Manual-En - 第52页

NPM Maint en anc e E di ti on 9.8 Li ne Camer a EJM9BE-M B-09M-21 Page 9-51 10 Turn ON the se rvo switch. 11 Press + [OK]. • T he cali br ation is carri ed out . ∗ For the 12- nozzle head and t he 8-noz zle head, per f o…

100%1 / 99
NPM
Maintenance Edition
9.8 Line Camera
Page 9-50 EJM9BE-MB-09M-21
5
Press + [OK].
The head moves to the working position.
6
Turn OFF the servo switch.
7
Open the safety cover.
8
Attach the line camera jig.
Line camera jig
For 12-/8-nozzle head
For 2-nozzle head
12-nozzle head
Attach the line camera jig to the nozzle
position 9.
8-nozzle head
Attach the line camera jig to the nozzle
position 6.
2-nozzle head
Attach the line camera jig to the nozzle
position 1.
9
Close the safety cover.
UnitCalibLineCamera-02E00
5
NPM
Maintenance Edition
9.8 Line Camera
EJM9BE-MB-09M-21 Page 9-51
10
Turn ON the servo switch.
11
Press + [OK].
The calibration is carried out.
For the 12-nozzle head and the 8-nozzle
head, perform step 18 onward.
For the 2-nozzle head, proceed to the
following steps continuously.
12
Turn OFF the servo switch.
13
Open the safety cover.
14
Check the head installation angle.
Check that the nozzle holder claw is on the
left side.
15
Close the safety cover.
Nozzle holder claw
UnitCalibLineCamera-03E00
11
NPM
Maintenance Edition
9.8 Line Camera
Page 9-52 EJM9BE-MB-09M-21
16
Turn ON the servo switch.
17
Press [Yes].
18
Turn OFF the servo switch.
19
Open the safety cover.
20
Relocate the line camera jig.
12-nozzle head
Relocate the line camera jig from the nozzle
position 9
4.
8-nozzle head
Relocate the line camera jig from the nozzle
position 6
3.
2-nozzle head
Relocate the line camera jig from the nozzle
position 1
2.
UnitCalibLineCamera-04E00
17