NPM Calibration Manual-En - 第64页

NPM Maint en anc e E di ti on 9.9 Ji g Stati on EJM9BE-M B-09M-21 Page 9-63 25 Turn OFF the se rvo switch. 26 Open the s afety cover. 27 Remove the j i g station. 28 Close the safety cover . 29 Turn ON the se rvo switch.…

100%1 / 99
NPM
Maintenance Edition
9.9 Jig Station
Page 9-62 EJM9BE-MB-09M-21
19
Close the safety cover.
20
Turn ON the servo switch.
21
Press + [OK].
The calibration is carried out.
22
Check that it is successfully complete.
Perform steps 3–22 for also the other table.
23
Press .
When exiting this screen to the other one, you
are always prompted to save the data.
To save the data obtained by the calibration,
press [Yes].
If you press [No], the return-to-origin process
is carried out and the data obtained by the
calibration are lost.
After the above operation, the next screen is
displayed.
24
Press + [OK].
The head moves to the retraction position.
UnitCalibJigStation-07E02
22
23
21
24
NPM
Maintenance Edition
9.9 Jig Station
EJM9BE-MB-09M-21 Page 9-63
25
Turn OFF the servo switch.
26
Open the safety cover.
27
Remove the jig station.
28
Close the safety cover.
29
Turn ON the servo switch.
30
Press + [OK].
31
Press + [OK].
The head moves to the working position.
32
Turn OFF the servo switch.
33
Open the safety cover.
31
30
NPM
Maintenance Edition
9.9 Jig Station
Page 9-64 EJM9BE-MB-09M-21
34
Detach the nozzles from the nozzle
changer.
35
Close the safety cover.
36
Turn ON the servo switch.
37
Press + [OK].
The screen selected in step 23 is displayed.
37