NPM Calibration Manual-En - 第80页

NPM Maint en anc e E di ti on 9.12 Ver tic al Li ne Ca m era EJM9BE-M B-09M-21 Page 9-79 9.12 Vertical Line C amera 1 Press . 2 Press [Vert i calCam era]. 3 Select a tab le. ∗ Sel ect the tar get t able for cali brati on…

100%1 / 99
NPM
Maintenance Edition
9.11 Height Offset
Page 9-78 EJM9BE-MB-09M-21
20
Remove the pickup-position-height
teaching jig.
21
Press + [OK].
The head moves to the working position.
22
Turn OFF the servo switch.
23
Open the safety cover.
24
Detach the nozzles.
25
Close the safety cover.
26
Turn ON the servo switch.
27
Press + [OK].
After the head moves to the origin position,
the screen selected in step 19 is displayed.
UnitCalibHeadHightMeasure-08E00
21
UnitCalibHeadHightMeasure-09E00
27
NPM
Maintenance Edition
9.12 Vertical Line Camera
EJM9BE-MB-09M-21 Page 9-79
9.12 Vertical Line Camera
1
Press .
2
Press [VerticalCamera].
3
Select a table.
Select the target table for calibration.
4
Press + [Nozzle install].
The head moves to the working position.
5
Turn OFF the servo switch.
6
Open the safety cover.
7
Attach the nozzle to the displayed
nozzle position.
12-nozzle head
Attach the 230CS nozzle to the nozzle
position 4.
8-nozzle head
Attach the 230C nozzle to the nozzle position
3.
2-nozzle head
Attach the No.1003 nozzle to the nozzle
position 2.
8
Close the safety cover.
9
Turn ON the servo switch.
UnitCalibVerticalLineCamera-01E00
1
2
3
4
NPM
Maintenance Edition
9.12 Vertical Line Camera
Page 9-80 EJM9BE-MB-09M-21
10
Press + [OK].
11
Press + [Camera offset].
The calibration is carried out.
12
Check that it is successfully complete.
Perform steps 3–12 for also the other table.
UnitCalibLineCamera-02E01
10
UnitCalibVerticalLineCamera-01E00
11
UnitCalibVerticalLineCamera-03E00