NPM Calibration Manual-En - 第85页
NPM Maint en anc e E di ti on 9.13 T ray Page 9-84 EJM9BE-M B-09M-21 9 Press + [OK]. • T he cali br ation is carri ed out . 10 Check that it i s successfu ll y com pl ete. 11 Press + [Pickup pos. 1]. • T he cali br ation…

NPM
Maintenance Edition
9.13 Tray
EJM9BE-MB-09M-21 Page 9-83
9.13 Tray
The following is the calibration procedure for the machine equipped with the tray feeder.
This procedure is exclusive to the machines with 8-nozzle head or 2-nozzle head.
Perform operation from the rear side.
1
Press .
2
Press [Tray].
3
Press + [Pickup].
4
Turn OFF the servo switch.
5
Open the safety cover.
6
Attach the nozzle.
8-nozzle head
∗
Attach the No. 230C nozzle to the nozzle
position 3.
2-nozzle head
∗
Attach the No.1003 nozzle to the nozzle
position 2.
7
Close the safety cover.
8
Turn ON the servo switch.
UnitCalibTrayPos-01E00
1
2
3

NPM
Maintenance Edition
9.13 Tray
Page 9-84 EJM9BE-MB-09M-21
9
Press + [OK].
•
The calibration is carried out.
10
Check that it is successfully complete.
11
Press + [Pickup pos. 1].
•
The calibration is carried out.
12
Check that it is successfully complete.
13
Press + [Pickup pos. 2].
•
The calibration is carried out.
UnitCalibTrayPos-02E00
9
UnitCalibTrayPos-03E00
10
11
UnitCalibTrayPos-04E00
12
13

NPM
Maintenance Edition
9.13 Tray
EJM9BE-MB-09M-21 Page 9-85
14
Check that it is successfully complete.
15
Press .
•
When exiting this screen to the other one, you
are always prompted to save the data.
∗
To save the data obtained by the calibration,
press [Yes].
•
If you press [No], the return-to-origin process
is carried out and the data obtained by the
calibration are lost.
•
After the above operation, the next screen is
displayed.
16
Press + [OK].
•
The head moves to the retraction position.
UnitCalibTrayPos-06E00
15
UnitCalibTrayPos-05E00
14
UnitCalibTrayPos-07E00
16