1OM-1505 5. Running-In Operation : Chap.3 3-22 1002-002 5. Running-In Operation After the machine has been stopped for a long period of time, perform a running- in operation for approx. 30 minutes to smoothly start up th…

100%1 / 217
1OM-1505
4. Automatic Operation Stop, Interruption and Re-Start : Chap.3
3-211002-003
4.2 Interruption of Automatic Operation
To stop the machine immediately in an emergency, press the [EMERGENCY
STOP] switch.
[EMERGENCY STOP] Switch
F1C24
An alarm is issued and the [POWER ON] button illuminates in red.
4.3 Automatic Operation Re-Start
When the [START] button on the operation panel is pressed, the automatic
operation is re-started.
Note
Once the zeroing operation has been performed, the automatic operation can be
re-started even when each axis is not zeroed.
1OM-1505
5. Running-In Operation : Chap.3
3-221002-002
5. Running-In Operation
After the machine has been stopped for a long period of time, perform a running-
in operation for approx. 30 minutes to smoothly start up the machine.
Procedure
(1) Select an appropriated pattern program in the "PRGM. CHANGE" window
in the "Setup" menu and perform the processing until the completion of the
conveyor width setup operation.
(2) Press the "TEST Opn. Mode" tab.
(The following tab sheet will be displayed.)
[1]
[2]
[3]
Select one for "RUN MODE"
Select one for "RUN MODE"
Select "ON" or "OFF"
for each operation item
Select "ON" or "OFF"
for each operation item
Save the setting
Save the setting
F1C25
(4) Press the [TEST] button for the "RUN MODE".
(5) Select "ON" or "OFF" for each item in the "TEST RUN SPECIFY" pane and
press the [Data Save] button.
(The specied test pattern will be set for the running-in operation.)
(6) Press the [START] button on the operation panel.
(The running-in operation will be started.)
Note
To stop the running-in operation, press the [STOP] button on the operation
panel.
Graphic
Development
1OM-1505
0906-001 4-A
Chapter 4
Program Change Operation
This chapter describes how to perform a program change operation.
1. Outline of Program Change Operation
2. Preparation for Program Change Operation
3. Program Change Operation
4. Test Print and Automatic Operation