2OM-1751 2-45 V ac. Ctrl. delayed starts The time period from the operation start-up in the PCB positioning clearance operation to the vacuum pick-up turning OFF, is set in this data box. V ac. Wtg. Timer The time period…

100%1 / 380
2OM-1751
2-441303-001
1st speed DCLR SET
The speed reduction rate for the backup base rst stage operation in the PCB
positioning, is setup in this data box. This value is reected on the speed and
acceleration.
2nd speed DCLR SET
The speed reduction rate for the backup base second stage operation in the
PCB positioning, is setup in this data box. This value is reected on the
speed and acceleration.
Vac. Ctrl. delayed starts
The time period from the backup base rst stage operation start-up in the
PCB positioning to the vacuum pick-up turning ON, is set in this data box.
Vac. Wtg. Timer
The time period from the backup base rst stage operation start-up in the
PCB positioning to the second stage operation start-up, is set in this data box.
Z clamp waiting time
The time period for judging for the Z-Clamp Moving-up Completion in the
PCB positioning, is set in this data box.
(D02_10)
DN
MOVE
"Standard" or "Value Designation" is selected for the PCB positioning
moving -down operation.
Standard
: The operation is performed based on the standard
values set in the machine.
Value Designation
: For the operation procedure, the selected values
can be setup.
1st speed DCLR SET
The speed reduction rate for the backup base rst stage operation in the
PCB positioning clearance operation, is setup in this data box. This value is
reected on the speed and acceleration.
2nd speed DCLR SET
The speed reduction rate for the backup base second stage operation in the
PCB positioning clearance operation, is setup in this data box. This value is
reected on the speed and acceleration.
3.4 Control
2OM-1751
2-45
Vac. Ctrl. delayed starts
The time period from the operation start-up in the PCB positioning clearance
operation to the vacuum pick-up turning OFF, is set in this data box.
Vac. Wtg. Timer
The time period from the rst stage operation completion to the second stage
operation start-up in the PCB positioning clearance operation, is set in this
data box.
Damaged Vac. Wtg. time
The time period of the vacuum breakage ON operation in the PCB
positioning clearance operation, is set in this data box.
Backup axis DN start DLY
The time period until the backup base rst stage operation start-up in the
PCB positioning clearance operation, is set in this data box.
1303-001
3.4 Control
2OM-1751
2-46
(D03) Transfer Speed Data
When the [Transfer Speed] tab is pressed in the "Control"window, the
following tab sheet appears.
F2B39
1303-001
3.4 Control
Graphic