2OM-1751-003w_G5S - 第220页

2OM-1751 4-6 1303-001 [11] [12] [13] "Mach.Prfrm," Tab Sheet (2/5) F2D4 [1 1] Power on time Shown is the period of time during which the control power of the machine was working. Note Example: 10:03'50&quo…

100%1 / 380
2OM-1751
4-51303-001
[5] Total components
Shown is the number of picked components (the number of pickup
operations).
[6] Total handling errors (A+B+G+L)
Shown is the total number of component handling errors.
[7] Rate of handling errors(%)
Shown is the percentage of handling errors per total number of picked
components.
[8] Shortage of component
Shown is the total number of detected component shortage errors.
[9] Waste components
Shown is the total number of components that were picked up but not placed.
Note
The indicated number of components represents the components that
were not placed due to a vertical component error (sensor), a component
recognition error, a component thickness error, interrupted production, the
detection (Unit PCB BBR Mode: Option) of a defective unit PCB., etc.
[10] Warm-up run(Test Md)
The data of the warm-up run (dry cycle) is counted.
PCB counter
The number of PCBs is counted when the machine is operated under the
following condition.
"TEST PATTERN" is enabled in the "Test Mode" window.
The "PCB Transfer Dsbl." check box is checked
(State in which no PCB is put in and out)
Not Picked Counts
The number of non-handling/non-placed actions is counted when the
machine is operated under the following condition.
"TEST PATTERN" is enabled in the "Test Mode" window.
The "Handling/Place Disabled" or the "Vacuum/Blower Disabled" check
box is ticked.
Note
The number of non-handling and placement actions is counted although
the X/Y beam takes running actions.
2.1 "Mach.Prfrm," Tab Sheet
2OM-1751
4-61303-001
[11]
[12]
[13]
"Mach.Prfrm," Tab Sheet (2/5) F2D4
[11] Power on time
Shown is the period of time during which the control power of the machine
was working.
Note
Example:
10:03'50" (10 hours, 3 minutes, and 50 seconds)
Auto run time
Shown is the period of time during which the machine was running
automatically. When a particular pattern program is set several times as
current one, the sum total is computed.
Placement time
Shown is the time required to nish a PCB (from the rst to the last
component placement on one product PCB).
The essential component placement time is summed up. While the machine
is set in the "STOP" or the "PAUSE" mode or a step operation is performed,
the time is not measured.
This is used to calculate the average placement tact time per component.
PCB transfer time
Shown is the period of time during which Conveyor NL, NR, NA, NB, and
NC are being activated.
PCB wait
Input wait
Shown is the period of time during which the machine was completely in
the waiting mode (the machine was waiting for a PCB to be loaded from the
input machine).
2.1 "Mach.Prfrm," Tab Sheet
2OM-1751
4-71303-001
Output wait
Shown is the period of time during which the machine was completely in
the waiting mode (the machine was waiting for a PCB to be unloaded to the
output machine).
PEC/BBR
Shown is the period of time during which the machine is taking PEC
recognition and BBR detection actions.
Counted is the period of time during which the X/Y table starts moving and
the PEC recognition and BBR detection are completed.
Others
Shown is the period of time during which the X/Y beam takes actions before
component placement, the X/Y table returns after component placement, etc.
Stop time
Shown is the period of time during which component placement operation
was interrupted for component replenishment, etc.
Error stop
Shown is the total time period when the machine is stopped due to a machine
error during the operation or standby.
Note
The time period of a machine error during maintenance or setup, except
for automatic operation, is not included.
Error alarm
Shown is the period of time during which an alarm (light tower ON) is
issued.
Recovery
Shown is the time between error cancellation and restart of machine
operation.
Maintenance time
Shown is the time period from pattern program change completion to
machine status turned to be "RUN"or "WAIT".
Feeder Reload
Shown is the machine stop time period from the occurrence of component
shortage to re-start of the machine.
Others
Shown is the time period during which the pattern program is changed or
machine idling operation is performed.
2.1 "Mach.Prfrm," Tab Sheet