00195440-05-SG_D-Series_FSE-EN - 第244页

14 SITEST 14.2 Calibration 14.1.2 SITEST Overview 603 244 Student Guide SIPLACE D-Series (FSE) 14.2 1 4 . 2 C a lib r a t io n Calibration Tools and SITEST ▪ Calibration tool – general – Version III not t ransparent is f…

100%1 / 290
14 SITEST
14.1.2 SITEST Overview 603 14.1 Overview SITEST
Student Guide SIPLACE D-Series (FSE) 243
14.1.2
14.1.2 SITEST Overview 603
SITEST Overview 603
As you can see in the overview diagram, the calibration menus in the SITEST software are allocated to
the hardware components on which each is fitted or for which the function is used.
14 SITEST
14.2 Calibration 14.1.2 SITEST Overview 603
244 Student Guide SIPLACE D-Series (FSE)
14.2
14.2 Calibration
Calibration
Tools and SITEST
Calibration tool – general –
Version III not transparent is for HF/X/D/Di machines with C&P6/12 and Twin/P&P Head [03010565-
01]
(Version II transparent is for S/F/HS machines [00316308-03], calibration nozzle 920)
(Version for SST23 at X machines with C&P20 head [03034148-xx])
Nozzles – general –
Type 956, 517, 518, nozzle for ZPC of D-axis TH [03008862-03]
(C&P20 head: 1235)
Setting gauge for S tables
Board for calibrating the PCB conveyor width
2D coplan - (ILD2200) - calibration tool
SITEST, version 602.xx or higher
DANGER
RISK OF INJURY!
The gantry may move during some of the following procedures.
Therefore, before you begin with any of these procedures make sure that you and everyone
else stay physically clear of the travel range of the gantries.
Also, sure, that no objects are in the way.
NOTICE
Cause of Hazard
Before you begin with the calibration, you must reference the heads and the gantries.
During calibration, unused gantries will automatically be moved to their parking position.
To completely calibrate the machine, go to Calibrate machine... and select the Calibrating the
entire machine menu. This provides all the required calibration functions.
14 SITEST
14.2.1 Calibration - General Sequence 14.2 Calibration
Student Guide SIPLACE D-Series (FSE) 245
14.2.1
14.2.1 Calibration - General Sequence
Calibration - General Sequence
General sequence to calibrate the machine
14.2.2
14.2.2 Requirements for Calibration of Nozzle Changers in the SIPLACE D/Di Machines
Requirements for Calibration of Nozzle Changers in the SIPLACE D/Di Machines
Start SITEST.
by selecting the menu items MAIN VIEW, Overall reference run, to start the reference run for all gan-
tries and heads.
Configure the nozzle changer and check the component levels.
Precondition for calibrating the nozzle changer
Each magazine in the NC must be configured with a nozzle type.
There should be no nozzle at segment 1 .