Printer 600 Preventive Maintenance.pdf - 第6页
35(9(17,9(0 $,17(1$ 1&( :((./<0$ ,17(1$1 &( 29.6 Technical Reference Manual Chapter Issue 4 May 03 WEEKL Y MAINTENANCE W ARNIN G HARMFUL SUBST ANCE S. CLEANING WIPES AND CLEANIN G SOLUTIONS MA Y CONT AIN SUB…

35(9(17,9(0$,17(1$1&(
'$,/<0$,17(1$1&(
Chapter Issue 4 May 03 Technical Reference Manual 29.5
DAILY MAINTENANCE
WARNING
HARMFUL SUBSTANCES. CLEANING WIPES AND CLEANING SOLUTIONS MAY
CONTAIN SUBSTANCES HAZARDOUS TO HEALTH. OBSERVE ALL
MANUFACTURERS’ HEALTH AND SAFETY GUIDELINES. ALWAYS WEAR
APPROVED PROTECTIVE CLOTHING WHEN CLEANING THE MACHINE.
Preparation The machine must be isolated from electrical power and air pressure.
General
NOTE
Any items heavily contaminated requiring thorough cleaning must be re-lubri-
cated in accordance with the appropriate monthly maintenance task.
No. Task Tools Completed Comments
1 Remove any debris from the rising table top
area and clean.
Spatula,
IPA Impregnated
Wipes
2 Remove any debris from the machine surfaces
and clean.
NOTE
Use only soap and water on the machine view-
ing panels.
Spatula,
IPA Impregnated
Wipes
3 Inspect the bearing rails of the following:
a. Print Carriage
b. Paste Dispense Carriage
c. Camera Carriage
Remove any debris and clean as necessary.
Spatula,
IPA Impregnated
Wipes
4 Clean the top of the board at left and board at
right sensors.
Spatula,
IPA Impregnated
Wipes
5 Remove any debris from chase assembly. Spatula,
IPA Impregnated
Wipes
6 Clean the paste dispense drip tray. Spatula,
IPA Impregnated
Wipes
7 Inspect the FormFlex tooling modules for signs
of leaks. If leak found, replace tooling module
(if fitted).
8 Remove any debris from the FormFlex tooling
modules and clean.
Spatula,
IPA Impregnated
Wipes
Estimated time required for daily tasks 8.0 mins

35(9(17,9(0$,17(1$1&(
:((./<0$,17(1$1&(
29.6 Technical Reference Manual Chapter Issue 4 May 03
WEEKLY MAINTENANCE
WARNING
HARMFUL SUBSTANCES. CLEANING WIPES AND CLEANING SOLUTIONS MAY
CONTAIN SUBSTANCES HAZARDOUS TO HEALTH. OBSERVE ALL
MANUFACTURERS’ HEALTH AND SAFETY GUIDELINES. ALWAYS WEAR
APPROVED PROTECTIVE CLOTHING WHEN CLEANING THE MACHINE.
Preparation The machine must be isolated from electrical power and air pressure.
General Remove any build up of dust, solder paste, or other debris from the following
areas of the machine:
NOTE
Any items heavily contaminated requiring thorough cleaning must be re-lubri-
cated in accordance with the appropriate monthly maintenance task.
No. Task Tools Completed Comments
1 Print Carriage:
a. Linear Bearings
b. Belts and Pulleys
Spatula,
IPA Impregnated
Wipes
2 Squeegee/ProFlow Assemblies:
a. Linear Bearings
b. Datum Surfaces
Spatula,
IPA Impregnated
Wipes
3 X and Y Camera Axes:
a. Linear Bearings
b. Belts and Pulleys
Spatula,
IPA Impregnated
Wipes
4 Rail System and Damper Areas:
a. Leadscrews
b. Clatter Bars
Spatula,
IPA Impregnated
Wipes
5 Paste Dispense System:
a. Linear Bearing
b. Drip Tray Mount Screws
Spatula,
IPA Impregnated
Wipes
6 Underscreen Cleaner (if fitted):
a. Linear Bearings
b. Magnet Assemblies
Spatula,
IPA Impregnated
Wipes
7 Rising Table Tool Plate and Magnetic Tooling
Pins.
Spatula,
IPA Impregnated
Wipes
8 Chase Assembly
a. Pulley Assemblies (ASM)
b. Stencil Guide Strips (ASM & standard Chase)
Spatula,
IPA Impregnated
Wipes

35(9(17,9(0$,17(1$1&(
:((./<0$,17(1$1&(
Chapter Issue 4 May 03 Technical Reference Manual 29.7
Machine Covers and External Connections
No. Task Tools Completed Comments
1 Remove any build up of dust, solder paste, or
other debris from the machine covers and pan-
els.
NOTE
Use only soap and water on the machine view-
ing panels.
Spatula,
IPA Impregnated
Wipes
2 Check correct operation of E Stops and all
cover switches.
3 Check condition of all external connections,
cables and pipes.
4 Review event log entries for the last week look-
ing for anomalies. Investigate and report anom-
alies to supervisor.
5 Copy the machine configuration and product file
data (see House Keeping Chapter, User man-
ual).
NOTE
These files will be required if a Windows NT
recovery procedure is carried out on the
machine.
Total estimated time required for weekly tasks 15.0 mins